2026-11-20
Completed in November 2026 by Guangdong Asher (USAWEGI), this school athletics track renovation replaced an aged, delaminating surface with a high-durability Hybrid Running Track engineered for daily student PE classes, all-weather drainage, and long-term joint protection.
| Project Name | Qingyuan Qinglong Primary School Hybrid Running Track Project |
|---|---|
| Location | Qingyuan, Guangdong, China |
| Completion Date | November 2026 |
| Track System | Hybrid Running Track (PU + EPDM Granule Surface) |
| Expected Service Life | 10 years (design service life under standard school use and maintenance; not a blanket warranty) |
| Compliance & Reports | Environmental & performance test documentation available upon inquiry |
The campus previously had an aged running track suffering from severe surface cracking and delamination. Because primary school tracks endure daily PE classes, recess running, and outdoor sun/rain exposure, the school needed a renovation system combining resilient cushioning with strong mechanical wear resistance.
A Hybrid Running Track system was selected using high-elasticity EPDM granules, polyurethane binders, UV-stabilized pigments, and anti-aging additives—delivering a low-glare granular finish that protects student joints while standing up to heavy daily foot traffic.
When paired with proper perimeter drainage, the track is ready for PE classes and training roughly 20 minutes after heavy rain or surface washing.
Calibrated surface elasticity absorbs impact and returns energy cleanly, helping protect students' knees and ankles during daily running.
Textured EPDM surface granules maintain reliable shoe grip during starts, turns, and damp weather.
Polyurethane tensile strength resists tearing from athletic spikes, while UV-stabilized materials help resist premature fading and hardening outdoors.
Send us your track layout, current base condition (concrete or asphalt), and climate profile to receive a matched system recommendation, BOQ estimate, and installation guide.