| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 10000 sq.m per Month |
A playground combines movement, equipment and spaces where children gather. ASHER-EF synthetic EPDM playground flooring offers a colored granular-surface direction for projects that need the play zones and their boundaries to be visible and inviting.
Start with the equipment plan, routes between activities and the supporting base. The selected rubber construction then supports a practical layout, with colors and details developed around the actual play area.

Contrasting colors can distinguish a slide landing area, circulation route or open-play space. Curves and shaped areas are developed in the design rather than created through last-minute color changes during installation.
Review physical granule samples for the final selection. The appearance of a mixed granular surface differs from a solid paint color, and neighboring batches should be coordinated where a large area is built in stages.

EPDM granules provide the selected colored wearing finish, used with a compatible binder and supporting construction. Where impact attenuation is required, the whole elastic system and its installed depth matter, not simply the presence of colored rubber.
Equipment fall heights and the applicable project or local safety requirements should determine the tested construction. No universal safe fall height is claimed for every thickness, and an image of a playground is not a safety-test certificate.

Play areas meet posts, curbs, drains and adjoining paving. Careful edge and transition details help avoid loose material, abrupt steps or difficult-to-clean gaps as the area enters use.
Discuss fixed equipment and inspection access before surfacing. The installation sequence needs to account for those elements so the crew is not cutting and repairing a newly finished area to accommodate an overlooked fitting.
Remove contamination and unsuitable material, repair defective support and establish the intended water route. The binder, primer if required and granular materials need to be compatible with the selected system and substrate.
Measure the components and apply them within the specified weather and curing limits. Keep children, maintenance equipment and other trades away from fresh work until the installation is ready to open.

Routine removal of litter, dirt and leaves helps protect the texture and appearance. Check seams between colors, equipment interfaces and high-use landing areas for local damage, loose material or changes needing attention.
Where the project requires impact or other acceptance testing, assess the installed surface using the agreed procedure. Keep the construction and material records so a future repair can match the approved system rather than rely only on color.
Can one thickness cover every item of play equipment? No. Equipment, fall-height requirements, the full construction and relevant test results determine suitability.
Will the surface drain on any base? The supporting design must provide the intended water path. A suitable rubber finish cannot compensate for a flooded or poorly prepared foundation.
Send the play-area dimensions, equipment layout and fall-height information, proposed base, drainage arrangement and color ideas. Include the applicable safety or acceptance brief if the project has one.
We can develop a material proposal identifying the EPDM finish, supporting construction, quantities and installation responsibilities. Contact USAWEGI with the plan to move from a color concept to a clearly specified playground surface.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 10000 sq.m per Month |
A playground combines movement, equipment and spaces where children gather. ASHER-EF synthetic EPDM playground flooring offers a colored granular-surface direction for projects that need the play zones and their boundaries to be visible and inviting.
Start with the equipment plan, routes between activities and the supporting base. The selected rubber construction then supports a practical layout, with colors and details developed around the actual play area.

Contrasting colors can distinguish a slide landing area, circulation route or open-play space. Curves and shaped areas are developed in the design rather than created through last-minute color changes during installation.
Review physical granule samples for the final selection. The appearance of a mixed granular surface differs from a solid paint color, and neighboring batches should be coordinated where a large area is built in stages.

EPDM granules provide the selected colored wearing finish, used with a compatible binder and supporting construction. Where impact attenuation is required, the whole elastic system and its installed depth matter, not simply the presence of colored rubber.
Equipment fall heights and the applicable project or local safety requirements should determine the tested construction. No universal safe fall height is claimed for every thickness, and an image of a playground is not a safety-test certificate.

Play areas meet posts, curbs, drains and adjoining paving. Careful edge and transition details help avoid loose material, abrupt steps or difficult-to-clean gaps as the area enters use.
Discuss fixed equipment and inspection access before surfacing. The installation sequence needs to account for those elements so the crew is not cutting and repairing a newly finished area to accommodate an overlooked fitting.
Remove contamination and unsuitable material, repair defective support and establish the intended water route. The binder, primer if required and granular materials need to be compatible with the selected system and substrate.
Measure the components and apply them within the specified weather and curing limits. Keep children, maintenance equipment and other trades away from fresh work until the installation is ready to open.

Routine removal of litter, dirt and leaves helps protect the texture and appearance. Check seams between colors, equipment interfaces and high-use landing areas for local damage, loose material or changes needing attention.
Where the project requires impact or other acceptance testing, assess the installed surface using the agreed procedure. Keep the construction and material records so a future repair can match the approved system rather than rely only on color.
Can one thickness cover every item of play equipment? No. Equipment, fall-height requirements, the full construction and relevant test results determine suitability.
Will the surface drain on any base? The supporting design must provide the intended water path. A suitable rubber finish cannot compensate for a flooded or poorly prepared foundation.
Send the play-area dimensions, equipment layout and fall-height information, proposed base, drainage arrangement and color ideas. Include the applicable safety or acceptance brief if the project has one.
We can develop a material proposal identifying the EPDM finish, supporting construction, quantities and installation responsibilities. Contact USAWEGI with the plan to move from a color concept to a clearly specified playground surface.