| MOQ: | 1000 square meters |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
Match the damping-pad option to the activities, base and desired surface response.

The pad is considered as part of the complete flooring system rather than as the visible grass finish.
State the required response, test method and intended equipment or activity in the project brief.

The selected pad, carpet and supporting base are assessed together. Any measured vibration, acoustic or impact result needs applicable evidence for that construction.
Identify dimensions, joints, edges and any required water routes with the installation plan.

Follow the selected material instructions so the supporting layer and carpet remain coordinated.
USAWEGI / D-01; selected pad dimensions, material construction, layout and applicable system-performance requirements.
Keep the approved sample and any applicable material or test information matched to the supplied product.
Prepare the supporting base, position the selected underlayer and complete the carpet installation. Inspect the finished area and retain the construction reference for maintenance.
The project drawing identifies the local work, interfaces and agreed acceptance requirements.
USAWEGI can discuss the requested lawn materials and associated installation supplies. Define the product and quantities with the intended use and site photographs.
Any technical documents or installation guidance required for the selected order are identified in the quotation.
Agree the supplied format, quantities, protective packing and destination with the order. Check identification and visible condition before installation.
Retain the sample or product reference for later maintenance and replacement enquiries.
Provide the country, area or layout, supporting-ground information and requested product specification. Include any required tests or compatibility information.
Get a Lawn-Accessories Proposal
| MOQ: | 1000 square meters |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
Match the damping-pad option to the activities, base and desired surface response.

The pad is considered as part of the complete flooring system rather than as the visible grass finish.
State the required response, test method and intended equipment or activity in the project brief.

The selected pad, carpet and supporting base are assessed together. Any measured vibration, acoustic or impact result needs applicable evidence for that construction.
Identify dimensions, joints, edges and any required water routes with the installation plan.

Follow the selected material instructions so the supporting layer and carpet remain coordinated.
USAWEGI / D-01; selected pad dimensions, material construction, layout and applicable system-performance requirements.
Keep the approved sample and any applicable material or test information matched to the supplied product.
Prepare the supporting base, position the selected underlayer and complete the carpet installation. Inspect the finished area and retain the construction reference for maintenance.
The project drawing identifies the local work, interfaces and agreed acceptance requirements.
USAWEGI can discuss the requested lawn materials and associated installation supplies. Define the product and quantities with the intended use and site photographs.
Any technical documents or installation guidance required for the selected order are identified in the quotation.
Agree the supplied format, quantities, protective packing and destination with the order. Check identification and visible condition before installation.
Retain the sample or product reference for later maintenance and replacement enquiries.
Provide the country, area or layout, supporting-ground information and requested product specification. Include any required tests or compatibility information.
Get a Lawn-Accessories Proposal