| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
Connect the selected 13 mm track build with the work the installation crew will carry out. Base preparation, compatible components, placement, curing and lane markings are identified together, giving the contractor a material plan tied to the venue drawing.
Identify which material belongs to each stage of the 13 mm construction. Base treatment, elastic support, the wearing finish and line paint are coordinated with the application instructions, so the site team receives a usable sequence.
Set out running routes, lane colours and markings with the venue drawing. The contractor can then plan work areas and material quantities, while allowing the selected layers to cure in the conditions required by the supplied system.
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
| Brand Name | USAWEGI |
|---|---|
| Model Number | AR-SP-04 |
| Weather Resistance | High |
| Color | Can Be Customized |
| Vertical Deformation | 0.6-3.0 |
| Tensile Strength | >0.5 |
| Installation | Easy |
| Resistance To Damage | High |
| Packaging Details | barrrel |
| Highlight | Tartan Running Track Smooth Surface, Customized Thickness Tartan Running Track |
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.
| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
Connect the selected 13 mm track build with the work the installation crew will carry out. Base preparation, compatible components, placement, curing and lane markings are identified together, giving the contractor a material plan tied to the venue drawing.
Identify which material belongs to each stage of the 13 mm construction. Base treatment, elastic support, the wearing finish and line paint are coordinated with the application instructions, so the site team receives a usable sequence.
Set out running routes, lane colours and markings with the venue drawing. The contractor can then plan work areas and material quantities, while allowing the selected layers to cure in the conditions required by the supplied system.
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
| Brand Name | USAWEGI |
|---|---|
| Model Number | AR-SP-04 |
| Weather Resistance | High |
| Color | Can Be Customized |
| Vertical Deformation | 0.6-3.0 |
| Tensile Strength | >0.5 |
| Installation | Easy |
| Resistance To Damage | High |
| Packaging Details | barrrel |
| Highlight | Tartan Running Track Smooth Surface, Customized Thickness Tartan Running Track |
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.