logo
Products
PRODUCTS DETAILS
Home > Products >
Excellent Shock Absorption IAAF Running Track For Bituminous Concrete

Excellent Shock Absorption IAAF Running Track For Bituminous Concrete

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Barrels
Delivery Period: Confirmed Based on Order Quantity and Production Schedule
Payment Method: T/T,L/C,Paypal
Supply Capacity: 10000 square meter per week
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
IAAF/WA/Labosports
Model Number
HR-RT
Service Life:
Eight-twelve Years
Shock Absorptionness:
35% To 50%
Thickness:
13mm
Surface:
All-weather Outdoor Running Tracks
Base Requirement:
Bituminous Concrete / Cement Concrete
Other:
Drainage And UV Resistance
Application:
Stadiums Schools Sports Facilities
Substrate Preparation:
Clean Dry Stable And Level Base
Installation Support:
Technical Guidance / On-Site Installation
Supply Scope:
Materials / Complete Track System
Surface Color:
Custom Colors Available
Highlight:

Bituminous Concrete IAAF Running Track

,

Bituminous Concrete Running Track

,

Excellent Shock Absorption IAAF Running Track

Product Description
HR-RT | Running Track System | Commercial & Project Procurement

A Shock-Absorbing Track Starts with the Right Foundation

Planning a running track over bituminous concrete (asphalt) or cement concrete? The critical question is not just whether the surface feels resilient. It is whether the selected system, substrate condition and construction method can deliver consistent performance across the entire site.

USAWEGI supports contractors, schools and sports facility owners with technical specification coordination, synthetic track materials, quantity planning and installation guidance. Start with the substrate and your required performance standard, then agree on a documented system before procurement.

13 mmLISTED NOMINAL THICKNESS
35%–50%LISTED SHOCK ABSORPTION RANGE*
HR-RTMODEL REFERENCE
1,000 m²LISTED STANDARD MOQ

*These values reproduce the existing product listing and are not a substitute for a model-specific laboratory report or installed-surface verification.

Request a Technical Proposal Send Drawings by Email
01 / Buyer Concerns

Three Expensive Risks to Resolve Before Ordering

01 / Substrate Risk

Will the surface bond to this base?

Cracks, moisture, contamination or unstable asphalt can compromise adhesion. Review the existing slab, repair strategy and approved primer compatibility before installation.

02 / Performance Risk

Will impact performance be consistent?

Nominal thickness alone does not prove force reduction. Clarify the target test method, exact system formulation and acceptance process before confirming quantities.

03 / Project Risk

Can the contractor deliver auditable results?

Specify the material list, installation conditions, inspections, required reports and handover documents to avoid scope disputes and late corrective work.

02 / Base Compatibility

Bituminous Concrete or Cement Concrete: Inspect the Base First

HR-RT is listed for use over both bituminous concrete and cement concrete. However, acceptance depends on the actual substrate and the proposed installation assembly. An existing asphalt track or new concrete slab should be reviewed for integrity, moisture, level tolerance and drainage before a coating specification is finalized.

Running track substrate acceptance checklist covering slope, moisture, repairs, cleanliness and drainage
Pre-installation assessment points. Project-specific limits and approved test methods must be confirmed in the technical specification.

For a New Asphalt Foundation

  • Confirm adequate compaction, curing and structural condition.
  • Verify flatness, slope and drainage layout against construction drawings.
  • Check cleanliness, substrate dryness and primer suitability.
  • Identify transitions at drains, kerbs, edges and lane boundaries.

For an Existing or Concrete Foundation

  • Map cracks, soft spots, previous repairs and contaminated zones.
  • Review movement joints and moisture-related installation risks.
  • Specify grinding, patching and repairs where necessary.
  • Approve a substrate preparation and adhesion approach before material dispatch.
Important: Do not assume that the synthetic running surface itself is water-permeable. Overall drainage performance depends on the selected system, substrate falls, outlets and site detailing. Ask for the drainage arrangement appropriate to your project.
03 / Published Model Data

HR-RT Technical Information & What to Verify

The following information reflects the current HR-RT listing. Exact performance and construction details should be checked against the latest product technical data sheet, laboratory evidence and the project BOQ.

Item HR-RT / Procurement Guidance
System category On-site synthetic athletic running track surfacing; final construction build-up to be agreed in writing.
Product / Model USAWEGI / HR-RT
Nominal thickness 13 mm as listed; confirm installed design thickness, tolerances and any required absolute minimum.
Shock absorption 35%–50% published range; request the report for the exact proposed assembly and required test method.
Substrate options Bituminous concrete / cement concrete, subject to site assessment and approved preparation.
Intended exposure Outdoor all-weather use is stated; confirm local UV, temperature, rainfall and maintenance requirements.
Service-life reference 8–12 years listed as an indicative expectation, not a universal guarantee; actual life depends on traffic, climate, installation and maintenance.
Order quantity 1,000 m² listed MOQ; exact order configuration and logistics in the quotation.
Documents to request TDS, SDS where applicable, system build-up, test reports, color sample, installation method statement, QC and warranty terms.
Certification requirement For a World Athletics-sensitive project, request a valid certificate for the exact product/system, nominated certified thickness and necessary facility testing. Listing keywords alone are not proof of certification.

The original page also lists barrel packaging, negotiable pricing and a stated dispatch period. Lead time, shipping origin, container loading, cost and payment terms should be reconfirmed for each project.

Four-stage track surfacing verification process from technical data and lab documents to site control and handover
Use technical documents and agreed acceptance criteria as the basis for a controlled project handover.
04 / System Selection

Don't Purchase an Unspecified 13 mm Surface

Different track constructions can use similar nominal thicknesses while delivering different water behavior, wear resistance, force reduction and installation requirements. Before quotation approval, confirm whether the project requires a porous, sandwich, full-PU, hybrid or other approved system. The final HR-RT layer composition and material specification must be identified in the technical submittal rather than inferred from generic product photographs.

Decisions to Lock Before Production

Use: school training, municipal recreation, club athletics or competition venue.
Climate: UV exposure, rainfall, temperature and maintenance capacity.
Performance: required force reduction, deformation, slip and other relevant tests.
Construction: approved primer, layer build-up, nominal/absolute thickness and curing plan.

Ask for a System-Level Submittal

Drawing: typical section with each specified layer and interface.
Data: actual system test results and certificates, if required.
Installation: preparation, mixing, application conditions and inspection points.
Handover: test records, routine care guidance and written warranty scope.

For specifiers: A World Athletics track surfacing product certificate and a completed athletics facility certificate are separate. Confirm which requirement is stated in your tender rather than treating one as a substitute for the other.
05 / Procurement & Engineering Support

From Material Quantity to Site Handover

USAWEGI serves as a U.S.-based commercial and project support contact, supported by sports surfacing manufacturing and supply capabilities in China. Depending on project scope, we can coordinate material supply, a complete sports facility package and installation services or technical guidance. The exact manufacturing origin and service scope are confirmed in the quotation and purchase contract.

Four-step running track project delivery workflow: specification review, bill of quantities, dispatch control, site support
Typical coordination scope; documented deliverables depend on project size and agreed contract responsibilities.
  1. Site & Drawing Review. Share dimensions, substrate type, planned new build or renovation, intended activity, project location and photos of the base.
  2. System & BOQ Confirmation. Agree on the proposed construction assembly, color, thickness, quantity takeoff, accessory needs and technical submittal.
  3. Commercial Offer. Confirm unit basis, MOQ, shipment origin, production window, shipping terms, payment terms and any included engineering or installation services.
  4. Production & Quality Records. Establish the specification baseline, batch/label requirements, packing list and loading records appropriate to the order.
  5. Shipment & Installation Coordination. Provide handling and installation guidance; arrange remote guidance or on-site service where contractually agreed.
  6. Project Acceptance & Care. Use the agreed site inspection and testing process; transfer cleaning, use and maintenance instructions to the owner.
06 / Applications & Ownership

Suitable Project Environments

Schools & Universities

Prioritize predictable training performance, student usage, maintenance accessibility and school-calendar construction phasing.

Municipal & Public Tracks

Confirm visitor load, public procurement documentation, drainage planning and lifecycle maintenance cost.

Club & Competition Facilities

Start from governing-body and event requirements, required tests and any facility certification pathway before choosing the surface system.

Long-Term Care Matters

Keep the surface free of debris, monitor blocked drains, clean spills promptly using compatible methods and inspect localized wear or edge damage. Restrict vehicle access and incompatible chemicals. Maintenance schedules and repair materials should follow the approved system documentation, not generic rubber-flooring advice.

07 / Project FAQ

Questions Contractors Usually Ask

Can this surface be applied over an existing asphalt running track?

Potentially, yes, after a project-specific inspection. Asphalt strength, moisture, cracks, flatness, drainage and prior coatings must be assessed. Remedial work or a different system may be required. Photographs and a condition survey make an initial recommendation more reliable.

Does a 13 mm thickness automatically achieve 35%–50% shock absorption?

No. The published range is a model listing value, not a guarantee for every installation. Actual force reduction depends on the system formulation, installed thickness, base and testing conditions. Request matching laboratory data and agree on acceptance criteria.

Is the track officially World Athletics certified?

Certification must be verified against the exact surfacing product, certificate identification and certified absolute thickness. World Athletics facility certification is a separate process. Ask for applicable documentary evidence before using any certification claim in a tender.

Is this a permeable running track?

Permeability is system-specific and has not been established by this listing. Do not infer it from all-weather or drainage-related marketing language. Confirm the complete assembly and drainage arrangement with the technical team.

Can you provide the complete track system instead of just material?

Project supply can include an agreed surfacing material package, relevant accessories, BOQ coordination, drawing support and installation guidance or services. The formal quotation should identify exactly what is included and what the local contractor supplies.

What should we submit to obtain an accurate quote?

Send country/city, total square meters, new or existing asphalt/concrete base, project drawing, target thickness, performance or tender standard, desired schedule, colors and delivery terms. If available, include current photographs and base test results.

What is the minimum quantity and how quickly can it ship?

The current product listing states an MOQ of 1,000 m² and a dispatch period after payment. Production slots, material system, destination, order volume and shipping terms can change the actual timeline, so request a project-specific quotation.

08 / Get a Decision-Ready Quotation

Send Your Site Plan. Receive a Track System Proposal.

To quote your 13 mm shock-absorbing running track accurately, send: site area and location, base type and condition, required standard, project deadline, and installation scope. We can then align the material specification, BOQ, logistical scope and technical support with your procurement process.

Request Quote & BOQ
Email Project Requirements

USAWEGI | U.S. Sales & Project Support | mark@usawegi.com | +1 909 655 7798

Products
PRODUCTS DETAILS
Excellent Shock Absorption IAAF Running Track For Bituminous Concrete
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Barrels
Delivery Period: Confirmed Based on Order Quantity and Production Schedule
Payment Method: T/T,L/C,Paypal
Supply Capacity: 10000 square meter per week
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
IAAF/WA/Labosports
Model Number
HR-RT
Service Life:
Eight-twelve Years
Shock Absorptionness:
35% To 50%
Thickness:
13mm
Surface:
All-weather Outdoor Running Tracks
Base Requirement:
Bituminous Concrete / Cement Concrete
Other:
Drainage And UV Resistance
Application:
Stadiums Schools Sports Facilities
Substrate Preparation:
Clean Dry Stable And Level Base
Installation Support:
Technical Guidance / On-Site Installation
Supply Scope:
Materials / Complete Track System
Surface Color:
Custom Colors Available
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
Barrels
Delivery Time:
Confirmed Based on Order Quantity and Production Schedule
Payment Terms:
T/T,L/C,Paypal
Supply Ability:
10000 square meter per week
Highlight

Bituminous Concrete IAAF Running Track

,

Bituminous Concrete Running Track

,

Excellent Shock Absorption IAAF Running Track

Product Description
HR-RT | Running Track System | Commercial & Project Procurement

A Shock-Absorbing Track Starts with the Right Foundation

Planning a running track over bituminous concrete (asphalt) or cement concrete? The critical question is not just whether the surface feels resilient. It is whether the selected system, substrate condition and construction method can deliver consistent performance across the entire site.

USAWEGI supports contractors, schools and sports facility owners with technical specification coordination, synthetic track materials, quantity planning and installation guidance. Start with the substrate and your required performance standard, then agree on a documented system before procurement.

13 mmLISTED NOMINAL THICKNESS
35%–50%LISTED SHOCK ABSORPTION RANGE*
HR-RTMODEL REFERENCE
1,000 m²LISTED STANDARD MOQ

*These values reproduce the existing product listing and are not a substitute for a model-specific laboratory report or installed-surface verification.

Request a Technical Proposal Send Drawings by Email
01 / Buyer Concerns

Three Expensive Risks to Resolve Before Ordering

01 / Substrate Risk

Will the surface bond to this base?

Cracks, moisture, contamination or unstable asphalt can compromise adhesion. Review the existing slab, repair strategy and approved primer compatibility before installation.

02 / Performance Risk

Will impact performance be consistent?

Nominal thickness alone does not prove force reduction. Clarify the target test method, exact system formulation and acceptance process before confirming quantities.

03 / Project Risk

Can the contractor deliver auditable results?

Specify the material list, installation conditions, inspections, required reports and handover documents to avoid scope disputes and late corrective work.

02 / Base Compatibility

Bituminous Concrete or Cement Concrete: Inspect the Base First

HR-RT is listed for use over both bituminous concrete and cement concrete. However, acceptance depends on the actual substrate and the proposed installation assembly. An existing asphalt track or new concrete slab should be reviewed for integrity, moisture, level tolerance and drainage before a coating specification is finalized.

Running track substrate acceptance checklist covering slope, moisture, repairs, cleanliness and drainage
Pre-installation assessment points. Project-specific limits and approved test methods must be confirmed in the technical specification.

For a New Asphalt Foundation

  • Confirm adequate compaction, curing and structural condition.
  • Verify flatness, slope and drainage layout against construction drawings.
  • Check cleanliness, substrate dryness and primer suitability.
  • Identify transitions at drains, kerbs, edges and lane boundaries.

For an Existing or Concrete Foundation

  • Map cracks, soft spots, previous repairs and contaminated zones.
  • Review movement joints and moisture-related installation risks.
  • Specify grinding, patching and repairs where necessary.
  • Approve a substrate preparation and adhesion approach before material dispatch.
Important: Do not assume that the synthetic running surface itself is water-permeable. Overall drainage performance depends on the selected system, substrate falls, outlets and site detailing. Ask for the drainage arrangement appropriate to your project.
03 / Published Model Data

HR-RT Technical Information & What to Verify

The following information reflects the current HR-RT listing. Exact performance and construction details should be checked against the latest product technical data sheet, laboratory evidence and the project BOQ.

Item HR-RT / Procurement Guidance
System category On-site synthetic athletic running track surfacing; final construction build-up to be agreed in writing.
Product / Model USAWEGI / HR-RT
Nominal thickness 13 mm as listed; confirm installed design thickness, tolerances and any required absolute minimum.
Shock absorption 35%–50% published range; request the report for the exact proposed assembly and required test method.
Substrate options Bituminous concrete / cement concrete, subject to site assessment and approved preparation.
Intended exposure Outdoor all-weather use is stated; confirm local UV, temperature, rainfall and maintenance requirements.
Service-life reference 8–12 years listed as an indicative expectation, not a universal guarantee; actual life depends on traffic, climate, installation and maintenance.
Order quantity 1,000 m² listed MOQ; exact order configuration and logistics in the quotation.
Documents to request TDS, SDS where applicable, system build-up, test reports, color sample, installation method statement, QC and warranty terms.
Certification requirement For a World Athletics-sensitive project, request a valid certificate for the exact product/system, nominated certified thickness and necessary facility testing. Listing keywords alone are not proof of certification.

The original page also lists barrel packaging, negotiable pricing and a stated dispatch period. Lead time, shipping origin, container loading, cost and payment terms should be reconfirmed for each project.

Four-stage track surfacing verification process from technical data and lab documents to site control and handover
Use technical documents and agreed acceptance criteria as the basis for a controlled project handover.
04 / System Selection

Don't Purchase an Unspecified 13 mm Surface

Different track constructions can use similar nominal thicknesses while delivering different water behavior, wear resistance, force reduction and installation requirements. Before quotation approval, confirm whether the project requires a porous, sandwich, full-PU, hybrid or other approved system. The final HR-RT layer composition and material specification must be identified in the technical submittal rather than inferred from generic product photographs.

Decisions to Lock Before Production

Use: school training, municipal recreation, club athletics or competition venue.
Climate: UV exposure, rainfall, temperature and maintenance capacity.
Performance: required force reduction, deformation, slip and other relevant tests.
Construction: approved primer, layer build-up, nominal/absolute thickness and curing plan.

Ask for a System-Level Submittal

Drawing: typical section with each specified layer and interface.
Data: actual system test results and certificates, if required.
Installation: preparation, mixing, application conditions and inspection points.
Handover: test records, routine care guidance and written warranty scope.

For specifiers: A World Athletics track surfacing product certificate and a completed athletics facility certificate are separate. Confirm which requirement is stated in your tender rather than treating one as a substitute for the other.
05 / Procurement & Engineering Support

From Material Quantity to Site Handover

USAWEGI serves as a U.S.-based commercial and project support contact, supported by sports surfacing manufacturing and supply capabilities in China. Depending on project scope, we can coordinate material supply, a complete sports facility package and installation services or technical guidance. The exact manufacturing origin and service scope are confirmed in the quotation and purchase contract.

Four-step running track project delivery workflow: specification review, bill of quantities, dispatch control, site support
Typical coordination scope; documented deliverables depend on project size and agreed contract responsibilities.
  1. Site & Drawing Review. Share dimensions, substrate type, planned new build or renovation, intended activity, project location and photos of the base.
  2. System & BOQ Confirmation. Agree on the proposed construction assembly, color, thickness, quantity takeoff, accessory needs and technical submittal.
  3. Commercial Offer. Confirm unit basis, MOQ, shipment origin, production window, shipping terms, payment terms and any included engineering or installation services.
  4. Production & Quality Records. Establish the specification baseline, batch/label requirements, packing list and loading records appropriate to the order.
  5. Shipment & Installation Coordination. Provide handling and installation guidance; arrange remote guidance or on-site service where contractually agreed.
  6. Project Acceptance & Care. Use the agreed site inspection and testing process; transfer cleaning, use and maintenance instructions to the owner.
06 / Applications & Ownership

Suitable Project Environments

Schools & Universities

Prioritize predictable training performance, student usage, maintenance accessibility and school-calendar construction phasing.

Municipal & Public Tracks

Confirm visitor load, public procurement documentation, drainage planning and lifecycle maintenance cost.

Club & Competition Facilities

Start from governing-body and event requirements, required tests and any facility certification pathway before choosing the surface system.

Long-Term Care Matters

Keep the surface free of debris, monitor blocked drains, clean spills promptly using compatible methods and inspect localized wear or edge damage. Restrict vehicle access and incompatible chemicals. Maintenance schedules and repair materials should follow the approved system documentation, not generic rubber-flooring advice.

07 / Project FAQ

Questions Contractors Usually Ask

Can this surface be applied over an existing asphalt running track?

Potentially, yes, after a project-specific inspection. Asphalt strength, moisture, cracks, flatness, drainage and prior coatings must be assessed. Remedial work or a different system may be required. Photographs and a condition survey make an initial recommendation more reliable.

Does a 13 mm thickness automatically achieve 35%–50% shock absorption?

No. The published range is a model listing value, not a guarantee for every installation. Actual force reduction depends on the system formulation, installed thickness, base and testing conditions. Request matching laboratory data and agree on acceptance criteria.

Is the track officially World Athletics certified?

Certification must be verified against the exact surfacing product, certificate identification and certified absolute thickness. World Athletics facility certification is a separate process. Ask for applicable documentary evidence before using any certification claim in a tender.

Is this a permeable running track?

Permeability is system-specific and has not been established by this listing. Do not infer it from all-weather or drainage-related marketing language. Confirm the complete assembly and drainage arrangement with the technical team.

Can you provide the complete track system instead of just material?

Project supply can include an agreed surfacing material package, relevant accessories, BOQ coordination, drawing support and installation guidance or services. The formal quotation should identify exactly what is included and what the local contractor supplies.

What should we submit to obtain an accurate quote?

Send country/city, total square meters, new or existing asphalt/concrete base, project drawing, target thickness, performance or tender standard, desired schedule, colors and delivery terms. If available, include current photographs and base test results.

What is the minimum quantity and how quickly can it ship?

The current product listing states an MOQ of 1,000 m² and a dispatch period after payment. Production slots, material system, destination, order volume and shipping terms can change the actual timeline, so request a project-specific quotation.

08 / Get a Decision-Ready Quotation

Send Your Site Plan. Receive a Track System Proposal.

To quote your 13 mm shock-absorbing running track accurately, send: site area and location, base type and condition, required standard, project deadline, and installation scope. We can then align the material specification, BOQ, logistical scope and technical support with your procurement process.

Request Quote & BOQ
Email Project Requirements

USAWEGI | U.S. Sales & Project Support | mark@usawegi.com | +1 909 655 7798

USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.