logo
Products
PRODUCTS DETAILS
Home > Products >
Colorful Custom EPDM Rubber Running Track With Excellent Shock Absorption And Easy Installation

Colorful Custom EPDM Rubber Running Track With Excellent Shock Absorption And Easy Installation

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 20000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
SGS, ISO
Model Number
EPDM
Flexibility:
Flexible Surface
Installation:
Easy
Thickness:
10mm,15mm,20mm Or Customized
Sample:
Free Sample; Freight Paid By Buyer
Shock Absorption:
Resilient Surface
Color:
Many Colors Can Be Chosen, Welcome To Customize
Length:
Customized
Durability:
Excellent
Sample Lead Time:
1-3 Days
Highlight:

Colorful EPDM Rubber Running Track

,

Easy Installation EPDM Rubber Running Track

Product Description

01 / RUNNING TRACK SYSTEM

Colour and appearance planned together

Review the actual sample under the venue’s lighting. Agree the colour layout, visible transitions and batch selection before calculating material quantities.

Colour and finish options
Colour and finish options · Confirm the selected configuration in the project specification.

02 / RUNNING TRACK SYSTEM

Project-specific configuration

Start with the site drawing, area and intended use. Agree the material, colour and configuration choices before confirming supply quantities and installation details.

Material sample
Material sample · Construction and configuration vary by selected model.

03 / RUNNING TRACK SYSTEM

Resilient response for the intended activity

Review the resilient construction together with the required performance tests. The selected layer build-up and supporting base determine the finished surface response.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Construction reference
Construction reference · Construction and configuration vary by selected model.
Surface detail
Surface detail · Construction and configuration vary by selected model.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number EPDM
Flexibility Excellent
Installation Easy
Thickness 10mm,15mm,20mm Or Customized
Sample Free For Sample,freight Self-pay
Shock Absorption Excellent
Color Many Colors Can Be Chosen, Welcome To Customize
Length Customized
Durability Excellent
Packaging Details barrrel
Highlight Colorful EPDM Rubber Running Track, Easy Installation EPDM Rubber Running Track

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Application reference
Application reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Packing reference
Packing reference · Confirm the selected configuration in the project specification.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

Products
PRODUCTS DETAILS
Colorful Custom EPDM Rubber Running Track With Excellent Shock Absorption And Easy Installation
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 20000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
SGS, ISO
Model Number
EPDM
Flexibility:
Flexible Surface
Installation:
Easy
Thickness:
10mm,15mm,20mm Or Customized
Sample:
Free Sample; Freight Paid By Buyer
Shock Absorption:
Resilient Surface
Color:
Many Colors Can Be Chosen, Welcome To Customize
Length:
Customized
Durability:
Excellent
Sample Lead Time:
1-3 Days
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
Drums
Delivery Time:
15-30 days, depending on order requirements
Payment Terms:
L/C,T/T,,Paypal,Western Union
Supply Ability:
20000 sq.m per Month
Highlight

Colorful EPDM Rubber Running Track

,

Easy Installation EPDM Rubber Running Track

Product Description

01 / RUNNING TRACK SYSTEM

Colour and appearance planned together

Review the actual sample under the venue’s lighting. Agree the colour layout, visible transitions and batch selection before calculating material quantities.

Colour and finish options
Colour and finish options · Confirm the selected configuration in the project specification.

02 / RUNNING TRACK SYSTEM

Project-specific configuration

Start with the site drawing, area and intended use. Agree the material, colour and configuration choices before confirming supply quantities and installation details.

Material sample
Material sample · Construction and configuration vary by selected model.

03 / RUNNING TRACK SYSTEM

Resilient response for the intended activity

Review the resilient construction together with the required performance tests. The selected layer build-up and supporting base determine the finished surface response.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Construction reference
Construction reference · Construction and configuration vary by selected model.
Surface detail
Surface detail · Construction and configuration vary by selected model.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number EPDM
Flexibility Excellent
Installation Easy
Thickness 10mm,15mm,20mm Or Customized
Sample Free For Sample,freight Self-pay
Shock Absorption Excellent
Color Many Colors Can Be Chosen, Welcome To Customize
Length Customized
Durability Excellent
Packaging Details barrrel
Highlight Colorful EPDM Rubber Running Track, Easy Installation EPDM Rubber Running Track

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Application reference
Application reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Packing reference
Packing reference · Confirm the selected configuration in the project specification.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.