logo
Products
PRODUCTS DETAILS
Home > Products >
Professional PU EPDM Tartan Running Track With High Tensile Strength 0.88 N/mm2

Professional PU EPDM Tartan Running Track With High Tensile Strength 0.88 N/mm2

MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
CE/SGS/ISO
Model Number
AR-SP-04
UV Resistance:
High
Surface:
EPDM Buffer Layer
Durability:
High
Thickness:
13mm Or Customized
Maintenance:
Low
Color:
Can Be Customized
Key Features:
Curtain Track Runner, Athletic Running Tracks, Agricultural Rubber Tracks, Rubber Track Pads
Warranty:
2 Years
Highlight:

0.88 N/mm2 Tartan Running Track

,

Professional PU Tartan Running Track

,

High Tensile Strength Tartan Running Track

Product Description

A bonded rubber surface for repeated training.

Rubber and compatible PU materials form the selected running surface across the athletics area. AR-SP-04 brings the listed PU and EPDM components into one proposed track construction.

Define the offered finish, selected thickness and project acceptance requirements together so procurement and installation follow the same specification.

Outdoor athletics lanes around school sports courts

Put the tensile requirement in the material brief.

Tensile testing measures how a material withstands pulling force. For a project requiring 0.88 N/mm², compare the selected construction against the specified test method and conditions.

Use the corresponding report to assess the offered construction. Tensile strength concerns the tested material; it is not a promise that a track can bridge a moving or cracked base.

Close view of a granular rubber sports-surface finish

Build the elastic surface as a complete system.

The rubber component, PU system and selected layer schedule work together beneath repeated running contact. Product information lists 13 mm or a customised construction.

Choose the finish for the intended activities and footwear. Where measured impact or friction results are required, assess the complete offered system against those criteria.

Prepare the foundation for the selected finish.

Review the base condition, levels and water routes before application. Identify repairs and local preparation separately from the material supply.

A clear base assessment helps the team address cracks, contamination and unsuitable areas before the running surface is installed.

Match lane colours to the agreed finish.

Use approved samples and the field drawing to define lanes, borders and line contrast. Record the colour references with the material list.

Keep the construction choice unchanged when comparing colours. A different appearance should not obscure a different layer schedule or formulation.

Follow one application and acceptance plan.

Materials, mixing, placement, curing and markings follow the selected instructions. Inspect each stage before moving to the next.

Agree the required handover checks for the actual installed surface. Keep component identification and relevant test documents in the project records.

Sports-surface material being mixed before application

Supply information that stays useful after handover.

USAWEGI can discuss the material proposal, quantities and installation guidance. Confirm packing, receiving checks and requested documents with the order.

During use, clear debris and outlets, inspect edges and busy zones, and retain compatible repair references for the selected surface.

Drums prepared for sports-surface material dispatch

Send the performance brief with the dimensions.

Share the country, track layout, base photographs and intended activities. Include the tensile requirement and other specified tests with their methods.

The proposal can then define the material configuration and supporting information for the project.

Request a Defined Track Material Proposal
Products
PRODUCTS DETAILS
Professional PU EPDM Tartan Running Track With High Tensile Strength 0.88 N/mm2
MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
CE/SGS/ISO
Model Number
AR-SP-04
UV Resistance:
High
Surface:
EPDM Buffer Layer
Durability:
High
Thickness:
13mm Or Customized
Maintenance:
Low
Color:
Can Be Customized
Key Features:
Curtain Track Runner, Athletic Running Tracks, Agricultural Rubber Tracks, Rubber Track Pads
Warranty:
2 Years
Minimum Order Quantity:
1000 square meters
Price:
negotiate
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
L/C,D/A,D/P,T/T,Western Union,
Supply Ability:
20000 Square Meter Per Week
Highlight

0.88 N/mm2 Tartan Running Track

,

Professional PU Tartan Running Track

,

High Tensile Strength Tartan Running Track

Product Description

A bonded rubber surface for repeated training.

Rubber and compatible PU materials form the selected running surface across the athletics area. AR-SP-04 brings the listed PU and EPDM components into one proposed track construction.

Define the offered finish, selected thickness and project acceptance requirements together so procurement and installation follow the same specification.

Outdoor athletics lanes around school sports courts

Put the tensile requirement in the material brief.

Tensile testing measures how a material withstands pulling force. For a project requiring 0.88 N/mm², compare the selected construction against the specified test method and conditions.

Use the corresponding report to assess the offered construction. Tensile strength concerns the tested material; it is not a promise that a track can bridge a moving or cracked base.

Close view of a granular rubber sports-surface finish

Build the elastic surface as a complete system.

The rubber component, PU system and selected layer schedule work together beneath repeated running contact. Product information lists 13 mm or a customised construction.

Choose the finish for the intended activities and footwear. Where measured impact or friction results are required, assess the complete offered system against those criteria.

Prepare the foundation for the selected finish.

Review the base condition, levels and water routes before application. Identify repairs and local preparation separately from the material supply.

A clear base assessment helps the team address cracks, contamination and unsuitable areas before the running surface is installed.

Match lane colours to the agreed finish.

Use approved samples and the field drawing to define lanes, borders and line contrast. Record the colour references with the material list.

Keep the construction choice unchanged when comparing colours. A different appearance should not obscure a different layer schedule or formulation.

Follow one application and acceptance plan.

Materials, mixing, placement, curing and markings follow the selected instructions. Inspect each stage before moving to the next.

Agree the required handover checks for the actual installed surface. Keep component identification and relevant test documents in the project records.

Sports-surface material being mixed before application

Supply information that stays useful after handover.

USAWEGI can discuss the material proposal, quantities and installation guidance. Confirm packing, receiving checks and requested documents with the order.

During use, clear debris and outlets, inspect edges and busy zones, and retain compatible repair references for the selected surface.

Drums prepared for sports-surface material dispatch

Send the performance brief with the dimensions.

Share the country, track layout, base photographs and intended activities. Include the tensile requirement and other specified tests with their methods.

The proposal can then define the material configuration and supporting information for the project.

Request a Defined Track Material Proposal
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.