| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | T/T |
| Supply Capacity: | 5000 Square Meter Per Week |
Customized PU + EPDM Running Track
Different sports facilities require different track structures. This customizable PU + EPDM system can be configured according to project use, performance level, thickness, color, foundation condition and local technical requirements.
![]()
A running track should not be selected only by price or color. Schools, stadiums, universities and training facilities can have very different requirements for drainage, elasticity, durability, surface response and installation method.
The final PU and EPDM layer structure is therefore selected according to the project budget, required performance level, base condition and intended use.
What Can Be Customized
Track System — Porous / Sandwich / Full PU / Hybrid
Thickness — 13mm Standard or Project-Based
Surface Finish — EPDM Spray or Granule Finish
Color — Red / Blue / Green / Black / Customized
Performance Level — School / Training / Stadium / Competition
Step 01
![]()
Step 02
A school training track does not always need the same system as a professional stadium. Performance should be matched to actual usage rather than over-specified.
Depending on the selected system, technical indicators can include shock absorption, vertical deformation, tensile strength, elongation and wet slip resistance.
School Use
Daily PE classes and general athletics
Training Facility
Repeated athletic training and club use
Stadium
Higher performance and long-term project requirements
Competition Project
Configuration matched to required technical standards
Step 03
13mm is a common reference thickness for many athletic track projects, but final thickness should be selected according to the track system, performance requirement and project specification.
Red remains the classic running track color, but blue, green, black and other colors can be selected according to stadium branding, school identity or architectural design.
Multi-color track areas can also be discussed for lane zones, training sections and surrounding sports surfaces.
Common Color Options
Red — Classic athletics appearance
Blue — Modern stadium and school projects
Green — Multi-sport and surrounding areas
Customized — Project branding and architectural requirements
![]()
Step 05
The same track system can perform very differently on a good base and a poor base. Before quotation or construction, the asphalt or concrete substrate should be checked carefully.
• Base flatness
• Asphalt or concrete condition
• Moisture
• Drainage slope
• Existing cracks
• Settlement condition
• New construction or renovation
• Required final elevation
Technical Snapshot
| System | Main Structure | Key Focus | Typical Use |
|---|---|---|---|
| Porous | SBR + PU Binder + EPDM Spray | Drainage & Practical Cost | School / General Athletics |
| Sandwich | SBR Base + PU Layers + EPDM | Balanced Performance | School / Stadium |
| Full PU | Dense PU + EPDM Surface | Stable Athletic Response | Stadium / Competition |
| Custom | Project-Based System | Flexible Specification | Special Project Requirements |
Provide your track area, drawings or site dimensions and we can help estimate PU, EPDM, SBR and related material quantities according to the selected system.
Technical recommendations, system drawings, installation guidance and project communication can be provided according to the actual project scope.
Before Quotation
FAQ
Yes. Provide the application, project location, budget level, base condition and required standard, and a suitable system can be recommended.
Yes. Thickness can be adjusted according to the selected track structure and project specification.
Yes. The final system can be selected according to required performance indicators and available test documentation.
Yes, but the existing surface and base condition should be evaluated before selecting the renovation solution.
Yes. Installation guidance and technical communication can be provided according to project requirements.
One project does not always fit one standard track system.
Share your project conditions and performance requirements, and we can help match the PU + EPDM running track configuration more precisely.
|
|
| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | T/T |
| Supply Capacity: | 5000 Square Meter Per Week |
Customized PU + EPDM Running Track
Different sports facilities require different track structures. This customizable PU + EPDM system can be configured according to project use, performance level, thickness, color, foundation condition and local technical requirements.
![]()
A running track should not be selected only by price or color. Schools, stadiums, universities and training facilities can have very different requirements for drainage, elasticity, durability, surface response and installation method.
The final PU and EPDM layer structure is therefore selected according to the project budget, required performance level, base condition and intended use.
What Can Be Customized
Track System — Porous / Sandwich / Full PU / Hybrid
Thickness — 13mm Standard or Project-Based
Surface Finish — EPDM Spray or Granule Finish
Color — Red / Blue / Green / Black / Customized
Performance Level — School / Training / Stadium / Competition
Step 01
![]()
Step 02
A school training track does not always need the same system as a professional stadium. Performance should be matched to actual usage rather than over-specified.
Depending on the selected system, technical indicators can include shock absorption, vertical deformation, tensile strength, elongation and wet slip resistance.
School Use
Daily PE classes and general athletics
Training Facility
Repeated athletic training and club use
Stadium
Higher performance and long-term project requirements
Competition Project
Configuration matched to required technical standards
Step 03
13mm is a common reference thickness for many athletic track projects, but final thickness should be selected according to the track system, performance requirement and project specification.
Red remains the classic running track color, but blue, green, black and other colors can be selected according to stadium branding, school identity or architectural design.
Multi-color track areas can also be discussed for lane zones, training sections and surrounding sports surfaces.
Common Color Options
Red — Classic athletics appearance
Blue — Modern stadium and school projects
Green — Multi-sport and surrounding areas
Customized — Project branding and architectural requirements
![]()
Step 05
The same track system can perform very differently on a good base and a poor base. Before quotation or construction, the asphalt or concrete substrate should be checked carefully.
• Base flatness
• Asphalt or concrete condition
• Moisture
• Drainage slope
• Existing cracks
• Settlement condition
• New construction or renovation
• Required final elevation
Technical Snapshot
| System | Main Structure | Key Focus | Typical Use |
|---|---|---|---|
| Porous | SBR + PU Binder + EPDM Spray | Drainage & Practical Cost | School / General Athletics |
| Sandwich | SBR Base + PU Layers + EPDM | Balanced Performance | School / Stadium |
| Full PU | Dense PU + EPDM Surface | Stable Athletic Response | Stadium / Competition |
| Custom | Project-Based System | Flexible Specification | Special Project Requirements |
Provide your track area, drawings or site dimensions and we can help estimate PU, EPDM, SBR and related material quantities according to the selected system.
Technical recommendations, system drawings, installation guidance and project communication can be provided according to the actual project scope.
Before Quotation
FAQ
Yes. Provide the application, project location, budget level, base condition and required standard, and a suitable system can be recommended.
Yes. Thickness can be adjusted according to the selected track structure and project specification.
Yes. The final system can be selected according to required performance indicators and available test documentation.
Yes, but the existing surface and base condition should be evaluated before selecting the renovation solution.
Yes. Installation guidance and technical communication can be provided according to project requirements.
One project does not always fit one standard track system.
Share your project conditions and performance requirements, and we can help match the PU + EPDM running track configuration more precisely.