| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
USWG-BR-01 connects the elastic rubber base, selected EPDM granules and compatible polyurethane binder in one porous track proposal. The layer schedule and measured area define the components to order, helping the contractor carry one construction from purchasing into application.
For the contractor, that makes the order a coordinated system instead of separate bags and drums that still need matching on site.
The binder connects compatible rubber granules, while the chosen EPDM contributes to the wearing finish. The elastic base supports the surface construction beneath.
Grades, particle choices and application quantities are recorded for the selected system. Mixing instructions remain attached to those actual materials.

The listed system uses an open-pore construction. Layer preparation and application must preserve the intended water route through the selected surface.
The foundation and outlets complete that route at the venue. Drainage access and debris removal remain part of the care plan.

Identify colours and connected areas, then approve a sample and construction schedule. The calculation assigns quantities to the base, binder and wearing materials.
Apply and cure the selected layers according to their instructions, complete markings and retain component identification for the site records.

USAWEGI can discuss components, quantities, packing and installation guidance. The order and receiving list identify the actual bags, drums and supplied references.
Any environmental or performance criteria require applicable information for the chosen materials. Keep the approved configuration with the project documents.
Clear debris and water routes and inspect busy zones. Cleaning and repairs follow the supplied construction so later work remains compatible.
Send the country, drawing, selected colours and layer requirements. We can prepare an itemised EPDM-and-PU porous-track material proposal.
Get Your Running Track Proposal
| MOQ: | 1000 square meters |
| Price: | negotiate |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
USWG-BR-01 connects the elastic rubber base, selected EPDM granules and compatible polyurethane binder in one porous track proposal. The layer schedule and measured area define the components to order, helping the contractor carry one construction from purchasing into application.
For the contractor, that makes the order a coordinated system instead of separate bags and drums that still need matching on site.
The binder connects compatible rubber granules, while the chosen EPDM contributes to the wearing finish. The elastic base supports the surface construction beneath.
Grades, particle choices and application quantities are recorded for the selected system. Mixing instructions remain attached to those actual materials.

The listed system uses an open-pore construction. Layer preparation and application must preserve the intended water route through the selected surface.
The foundation and outlets complete that route at the venue. Drainage access and debris removal remain part of the care plan.

Identify colours and connected areas, then approve a sample and construction schedule. The calculation assigns quantities to the base, binder and wearing materials.
Apply and cure the selected layers according to their instructions, complete markings and retain component identification for the site records.

USAWEGI can discuss components, quantities, packing and installation guidance. The order and receiving list identify the actual bags, drums and supplied references.
Any environmental or performance criteria require applicable information for the chosen materials. Keep the approved configuration with the project documents.
Clear debris and water routes and inspect busy zones. Cleaning and repairs follow the supplied construction so later work remains compatible.
Send the country, drawing, selected colours and layer requirements. We can prepare an itemised EPDM-and-PU porous-track material proposal.
Get Your Running Track Proposal