| MOQ: | 1000 square meters |
| Price: | negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
01 / RUNNING TRACK SYSTEM
Agree the cleaning, inspection and repair routine alongside the material specification. Access, available equipment and expected use influence the practical maintenance workload.
02 / RUNNING TRACK SYSTEM
Coordinate the material’s water behaviour with base permeability, levels and drainage outlets. Review the proposed complete construction under local rainfall and maintenance conditions.
03 / RUNNING TRACK SYSTEM
Choose the wear surface around activity intensity, traffic concentration and the cleaning routine. Request relevant test results for the exact proposed construction.
MATERIAL & CONSTRUCTION
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
PRODUCT CONFIGURATION
Information listed on the original product page. Confirm the selected model and technical data before ordering.
| Brand Name | USAWEGI |
|---|---|
| Model Number | USWG-BR-03 |
| Product Type | Porous Running Track System |
| Installation Method | Cast-in-Place |
| Total Thickness | 13-25mm |
| Surface Structure | Multi-Porous Elastic System |
| Drainage Type | Open-Porous |
| Tensile Elongation | >40% |
| Colors | Customized, Red, Green, Blue |
| Tensile Strength | >0.5 |
| Thickness | 13mm Or Customized |
| Weatherresistance | Water-resistant And UV-protected |
| Base Layer | Elastic Rubber Granule Cushion Layer |
| Shockabsorption | Integrated Cushioning System |
VENUE PLANNING
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
INSTALLATION
SUPPLY & HANDOVER
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
BUYER QUESTIONS
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
YOUR PROJECT
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.
|
|
| MOQ: | 1000 square meters |
| Price: | negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
| Supply Capacity: | 20000 Square Meter Per Week |
01 / RUNNING TRACK SYSTEM
Agree the cleaning, inspection and repair routine alongside the material specification. Access, available equipment and expected use influence the practical maintenance workload.
02 / RUNNING TRACK SYSTEM
Coordinate the material’s water behaviour with base permeability, levels and drainage outlets. Review the proposed complete construction under local rainfall and maintenance conditions.
03 / RUNNING TRACK SYSTEM
Choose the wear surface around activity intensity, traffic concentration and the cleaning routine. Request relevant test results for the exact proposed construction.
MATERIAL & CONSTRUCTION
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
PRODUCT CONFIGURATION
Information listed on the original product page. Confirm the selected model and technical data before ordering.
| Brand Name | USAWEGI |
|---|---|
| Model Number | USWG-BR-03 |
| Product Type | Porous Running Track System |
| Installation Method | Cast-in-Place |
| Total Thickness | 13-25mm |
| Surface Structure | Multi-Porous Elastic System |
| Drainage Type | Open-Porous |
| Tensile Elongation | >40% |
| Colors | Customized, Red, Green, Blue |
| Tensile Strength | >0.5 |
| Thickness | 13mm Or Customized |
| Weatherresistance | Water-resistant And UV-protected |
| Base Layer | Elastic Rubber Granule Cushion Layer |
| Shockabsorption | Integrated Cushioning System |
VENUE PLANNING
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
INSTALLATION
SUPPLY & HANDOVER
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
BUYER QUESTIONS
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
YOUR PROJECT
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.