| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | T/T,L/C,Paypal |
| Supply Capacity: | 40000 sq.m per Month |
01 / RUNNING TRACK SYSTEM
Consider rainfall, temperature changes, site exposure and the maintenance programme when selecting the complete surface construction.
02 / RUNNING TRACK SYSTEM
Identify material supply, equipment, site preparation, technical guidance and actual installation responsibilities in writing. Align handover and testing with the site programme.
03 / RUNNING TRACK SYSTEM
Match the surface specification to training frequency, activity zones and available maintenance time. Compare the proposed construction with the venue’s documented performance requirements.
MATERIAL & CONSTRUCTION
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
PRODUCT CONFIGURATION
Information listed on the original product page. Confirm the selected model and technical data before ordering.
| Brand Name | USAWEGI |
|---|---|
| Model Number | HRT IS4 |
| Weather Resistance | Excellent |
| Shock Absorption | Excellent |
| Slip Resistance | Excellent |
| UV Resistance | Excellent |
| Durability | Excellent |
| Surface Color | Customized |
| Color | Many Colors Can Be Chosen, Welcome To Customize |
| Thickness | 13mm Standard, Customizable |
| Packaging Details | barrrel |
| Highlight | Outdoor running track installation, Hybrid running track for training centers, Durable running track installation |
VENUE PLANNING
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
INSTALLATION
SUPPLY & HANDOVER
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
BUYER QUESTIONS
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
YOUR PROJECT
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | T/T,L/C,Paypal |
| Supply Capacity: | 40000 sq.m per Month |
01 / RUNNING TRACK SYSTEM
Consider rainfall, temperature changes, site exposure and the maintenance programme when selecting the complete surface construction.
02 / RUNNING TRACK SYSTEM
Identify material supply, equipment, site preparation, technical guidance and actual installation responsibilities in writing. Align handover and testing with the site programme.
03 / RUNNING TRACK SYSTEM
Match the surface specification to training frequency, activity zones and available maintenance time. Compare the proposed construction with the venue’s documented performance requirements.
MATERIAL & CONSTRUCTION
The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.
A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.
PRODUCT CONFIGURATION
Information listed on the original product page. Confirm the selected model and technical data before ordering.
| Brand Name | USAWEGI |
|---|---|
| Model Number | HRT IS4 |
| Weather Resistance | Excellent |
| Shock Absorption | Excellent |
| Slip Resistance | Excellent |
| UV Resistance | Excellent |
| Durability | Excellent |
| Surface Color | Customized |
| Color | Many Colors Can Be Chosen, Welcome To Customize |
| Thickness | 13mm Standard, Customizable |
| Packaging Details | barrrel |
| Highlight | Outdoor running track installation, Hybrid running track for training centers, Durable running track installation |
VENUE PLANNING
School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.
INSTALLATION
SUPPLY & HANDOVER
List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.
Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.
Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.
Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.
BUYER QUESTIONS
Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.
Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.
Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.
Standard order lead time: 15-30 days, depending on order requirements.
Sample lead time: 1-3 days.
Minimum order quantity and the selected packing are shown in the trading information for this product.
YOUR PROJECT
Send your location, area or layout and the following information:
Send your requirements using the enquiry form on this product page.