logo
Products
PRODUCTS DETAILS
Home > Products >
Easy Installation Athletic Running Track High Shock Absorption

Easy Installation Athletic Running Track High Shock Absorption

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drum
Delivery Period: within 15 days after balance
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 100,000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
USWPR-01
Product Name:
Sandwich System Running Track
Shock Absorption:
Excellent
Maintenance Requirement:
Low
Elasticity / Flexibility:
High
Available Colors:
Red, Blue, Custom Colors
Material Composition:
PU Coating + Prefabricated Roll Material + EPDM Granules
Surface:
Anti-slip Textured Surface
Durability:
High
Weather Resistance:
Excellent
Application:
School, Stadium, Sports Center
Service Life:
12-15 Years
Highlight:

Easy Installation Athletic Running Track

,

Athletic Running Track High Shock Absorption

Product Description

Make the track installation sequence easy to follow.

Define the supplied components and site work for the selected athletic-surface construction.

Track installation-sequence illustration
Illustrative view

The material schedule connects the prepared base, supporting layer and wearing finish. Keep the work sequence and responsibilities clear for the local team.

Compare the impact response of the complete surface.

The elastic construction and finish are selected together for the intended activities and footwear.

Layered running-surface sample

Request applicable shock-absorption or force-reduction information for the exact system and specify the required venue checks.

Choose the finish for the running programme.

Review the sample texture, colour and construction with the athletics layout.

School athletics-field reference

Keep the selected material and installation information with the order so each stage uses the same proposal.

Selected configuration

Record the exact product, construction, colour and required quantities with the approved sample. The material schedule identifies the supplied components and project checks.

Installation

Prepare the supporting base and follow the selected material instructions for placement, joining or application. Complete the markings, edges and agreed handover checks before use.

Supply and support

USAWEGI can discuss sports-surface materials, quantities and installation guidance. State the project location, planned use and local-work responsibilities in the proposal.

Packing and receiving

Confirm the supplied format, protective packing and destination with the order. Check quantities, labels and visible condition before installation.

Care and enquiry

Retain the construction reference for cleaning, maintenance and compatible repairs. Send the country, venue dimensions, photographs and required performance or installation information for a defined quotation.

Get a Defined Sports-Surface Proposal
Products
PRODUCTS DETAILS
Easy Installation Athletic Running Track High Shock Absorption
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drum
Delivery Period: within 15 days after balance
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 100,000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
USWPR-01
Product Name:
Sandwich System Running Track
Shock Absorption:
Excellent
Maintenance Requirement:
Low
Elasticity / Flexibility:
High
Available Colors:
Red, Blue, Custom Colors
Material Composition:
PU Coating + Prefabricated Roll Material + EPDM Granules
Surface:
Anti-slip Textured Surface
Durability:
High
Weather Resistance:
Excellent
Application:
School, Stadium, Sports Center
Service Life:
12-15 Years
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
Drum
Delivery Time:
within 15 days after balance
Payment Terms:
L/C,T/T,,Paypal,Western Union
Supply Ability:
100,000 sq.m per Month
Highlight

Easy Installation Athletic Running Track

,

Athletic Running Track High Shock Absorption

Product Description

Make the track installation sequence easy to follow.

Define the supplied components and site work for the selected athletic-surface construction.

Track installation-sequence illustration
Illustrative view

The material schedule connects the prepared base, supporting layer and wearing finish. Keep the work sequence and responsibilities clear for the local team.

Compare the impact response of the complete surface.

The elastic construction and finish are selected together for the intended activities and footwear.

Layered running-surface sample

Request applicable shock-absorption or force-reduction information for the exact system and specify the required venue checks.

Choose the finish for the running programme.

Review the sample texture, colour and construction with the athletics layout.

School athletics-field reference

Keep the selected material and installation information with the order so each stage uses the same proposal.

Selected configuration

Record the exact product, construction, colour and required quantities with the approved sample. The material schedule identifies the supplied components and project checks.

Installation

Prepare the supporting base and follow the selected material instructions for placement, joining or application. Complete the markings, edges and agreed handover checks before use.

Supply and support

USAWEGI can discuss sports-surface materials, quantities and installation guidance. State the project location, planned use and local-work responsibilities in the proposal.

Packing and receiving

Confirm the supplied format, protective packing and destination with the order. Check quantities, labels and visible condition before installation.

Care and enquiry

Retain the construction reference for cleaning, maintenance and compatible repairs. Send the country, venue dimensions, photographs and required performance or installation information for a defined quotation.

Get a Defined Sports-Surface Proposal
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.