logo
Products
PRODUCTS DETAILS
Home > Products >
Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material

Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material

MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Model Number
AR-SP-02
Product Name:
Full-polyurethane (PU) Track
Base Requirement:
Cement Concrete Or Bituminous Concrete
Thickness:
13mm Or Customized
Application:
Olympic Games, School, Sports Center
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Vertical Deformation:
2.4
Tensile Strength:
0.90 N/mm2
Ball Rebound:
99%
Feature:
Anti-Static, Thermal Insulation,Environmental-friendly, Durable, More Elastic
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Highlight:

Ultraviolet Proof IAAF Track Field

,

IAAF Track Field Floor Material

,

Ultraviolet Proof Full PU Running Track

Product Description
Full-PU athletic track · Sunlight exposure

Choose a full-PU track
for an exposed outdoor venue.

Bring the wearing finish and supporting polyurethane construction into one material proposal.

Outdoor stadium with a red running track surrounding the sports field

A running track exposed to sunlight needs its finish selected with the climate, activity programme and care routine. Compare the proposed material and applicable UV-weathering information for the project.

The selected full-PU construction is defined with the layer schedule, colour and site requirements.

Get an Outdoor Full-PU Track Proposal
UV-resistant finish selection

Keep colour and weathering
in the sample comparison.

Review the proposed wearing texture and colour with a physical sample. Request the applicable UV or ageing information for the offered formulation where the project requires it.

Specify the test method and exposure conditions with the material requirement. The finish and supporting construction are selected together for the outdoor use brief.

Full-PU running-surface sample showing the coloured granular wearing finish
What full-PU construction means

Polyurethane layers below.
A textured wearing finish above.

The original full-PU material reference shows the granular finish, PU adhesive and PU sealing layers. These form a coordinated running-surface construction.

Select the layer schedule and nominal thickness with the project specification. The listed 13mm option is confirmed for the proposed build-up and quantities.

Full-PU construction reference showing polyurethane layers and coloured finish
Base and track planning

Prepare the foundation
for the specified track.

The current record lists cement or asphalt bases. Review strength, condition, levels, moisture and water routes before material application.

The drawing coordinates lanes, bends and other athletics areas. Identify repairs, edge details and the required local preparation work separately from the material supply.

Configuration and acceptance

Define the actual system
and the evidence it needs.

Brand and listed model: USAWEGI / AR-SP-02. Select the full-PU build-up, thickness, wearing finish and colour with the approved sample.

For an athletics standard or approval requirement, request the applicable documents for the exact offered system and any required installed-venue tests.

Keep the component list, application quantities, installation instructions and acceptance requirements together with the order.

Installation

Prepare, apply and finish.
Complete the running layout.

The local team follows the selected preparation, mixing, placement and curing sequence. Check each stage before the next layer is applied.

The original installation photographs show surface finishing and lane marking. Inspect the completed surface and perform the agreed venue checks before opening.

Original full-PU surface finishing and track line-marking photographs
Supply and delivery

Keep the material schedule
with the shipment.

USAWEGI can discuss running-track supply, project drawings and installation guidance. Confirm the component quantities, packing and destination with the quotation.

Check labels and visible condition at receiving. Keep the selected sample, application information and handover records for the venue team.

Routine care and enquiries

Look after the finish
through outdoor use.

Remove debris, keep water routes clear and inspect worn areas and edges. Use compatible cleaning and repair methods for the selected surface.

Send the country, track drawing, base photographs, exposure conditions and required performance checks for a proposal. Include the desired colour and construction period.

Discuss Your UV-Resistance Requirements
Products
PRODUCTS DETAILS
Ultraviolet Proof IAAF Track Field , Full PU Running Track Floor Material
MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Model Number
AR-SP-02
Product Name:
Full-polyurethane (PU) Track
Base Requirement:
Cement Concrete Or Bituminous Concrete
Thickness:
13mm Or Customized
Application:
Olympic Games, School, Sports Center
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Vertical Deformation:
2.4
Tensile Strength:
0.90 N/mm2
Ball Rebound:
99%
Feature:
Anti-Static, Thermal Insulation,Environmental-friendly, Durable, More Elastic
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Minimum Order Quantity:
1000 square meters
Price:
negotiate
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
L/C,D/A,D/P,T/T,Western Union,
Supply Ability:
20000 Square Meter Per Week
Highlight

Ultraviolet Proof IAAF Track Field

,

IAAF Track Field Floor Material

,

Ultraviolet Proof Full PU Running Track

Product Description
Full-PU athletic track · Sunlight exposure

Choose a full-PU track
for an exposed outdoor venue.

Bring the wearing finish and supporting polyurethane construction into one material proposal.

Outdoor stadium with a red running track surrounding the sports field

A running track exposed to sunlight needs its finish selected with the climate, activity programme and care routine. Compare the proposed material and applicable UV-weathering information for the project.

The selected full-PU construction is defined with the layer schedule, colour and site requirements.

Get an Outdoor Full-PU Track Proposal
UV-resistant finish selection

Keep colour and weathering
in the sample comparison.

Review the proposed wearing texture and colour with a physical sample. Request the applicable UV or ageing information for the offered formulation where the project requires it.

Specify the test method and exposure conditions with the material requirement. The finish and supporting construction are selected together for the outdoor use brief.

Full-PU running-surface sample showing the coloured granular wearing finish
What full-PU construction means

Polyurethane layers below.
A textured wearing finish above.

The original full-PU material reference shows the granular finish, PU adhesive and PU sealing layers. These form a coordinated running-surface construction.

Select the layer schedule and nominal thickness with the project specification. The listed 13mm option is confirmed for the proposed build-up and quantities.

Full-PU construction reference showing polyurethane layers and coloured finish
Base and track planning

Prepare the foundation
for the specified track.

The current record lists cement or asphalt bases. Review strength, condition, levels, moisture and water routes before material application.

The drawing coordinates lanes, bends and other athletics areas. Identify repairs, edge details and the required local preparation work separately from the material supply.

Configuration and acceptance

Define the actual system
and the evidence it needs.

Brand and listed model: USAWEGI / AR-SP-02. Select the full-PU build-up, thickness, wearing finish and colour with the approved sample.

For an athletics standard or approval requirement, request the applicable documents for the exact offered system and any required installed-venue tests.

Keep the component list, application quantities, installation instructions and acceptance requirements together with the order.

Installation

Prepare, apply and finish.
Complete the running layout.

The local team follows the selected preparation, mixing, placement and curing sequence. Check each stage before the next layer is applied.

The original installation photographs show surface finishing and lane marking. Inspect the completed surface and perform the agreed venue checks before opening.

Original full-PU surface finishing and track line-marking photographs
Supply and delivery

Keep the material schedule
with the shipment.

USAWEGI can discuss running-track supply, project drawings and installation guidance. Confirm the component quantities, packing and destination with the quotation.

Check labels and visible condition at receiving. Keep the selected sample, application information and handover records for the venue team.

Routine care and enquiries

Look after the finish
through outdoor use.

Remove debris, keep water routes clear and inspect worn areas and edges. Use compatible cleaning and repair methods for the selected surface.

Send the country, track drawing, base photographs, exposure conditions and required performance checks for a proposal. Include the desired colour and construction period.

Discuss Your UV-Resistance Requirements
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.