logo
Products
PRODUCTS DETAILS
Home > Products >
Non Poisonous IAAF Running Track Systems Full PU Training use

Non Poisonous IAAF Running Track Systems Full PU Training use

MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
CE/SGS/ISO
Model Number
AR-FP-02
Product Name:
Full-polyurethane (PU) Track
Application:
Olympic Games, School, Sports Center
Thickness:
13mm
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Installation:
Easy
Maintenance:
Low
Width:
8m
Length:
400m
Surface:
Smooth
UV Resistance:
High
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Resilience:
High
Highlight:

Non Poisonous IAAF Running Track

,

IAAF Running Track Systems

,

Non Poisonous Full PU Running Track

Product Description
Full-PU track systems · Training use

A dedicated track
for the training programme.

Plan the running surface and lane layout around the sessions your venue intends to hold.

Marked red running track used as an athletics-training venue reference

The full-PU option is a layered athletic-surface construction. Select the material schedule, finish and required surface response together with the activities and footwear.

The proposal identifies the track construction and the site preparation and checks required for the project.

Get a Full-PU Training-Track Proposal
Full-polyurethane construction

Keep the supporting layers
and finish in one specification.

The full-PU construction reference shows the granular wearing finish above polyurethane adhesive and sealing layers. Their materials and application schedule are selected as one running system.

The current record lists 13mm for this option. Confirm the layer build-up and quantities with the proposal rather than inferring them from a photograph.

Original full-PU construction with coloured wearing finish and polyurethane layers
Material information for procurement

Know the formulation
and the reports requested for it.

Request the relevant component information and chemical or emissions test records for the offered formulation. Specify the required methods and product reference with the enquiry.

If an athletics approval is required, identify the exact system and relevant documents, along with any installed-venue checks. Keep the selected sample and report references with the order.

Full-PU running-surface sample showing the wearing texture
Venue planning

Connect the training layout
to the prepared foundation.

Review the supporting base, levels, moisture and water routes before surfacing work. The drawing sets the lanes, access and related athletics areas.

For refurbishment, include photographs of the existing track and any worn or damaged locations. Local repairs and preparation are defined separately from the new material supply.

Configuration

Record the full-PU option
for the actual project.

Brand and listed model: USAWEGI / AR-FP-02. Identify the full-PU build-up, selected thickness, finish and colours in the material schedule.

Confirm the component list, application quantities, required tests and handover criteria. The project drawing defines the real track dimensions and layout.

Keep installation instructions and the responsibilities for local preparation and testing together with the quotation.

Installation

Prepare, apply and mark
the selected running system.

Follow the preparation, mixing, application and curing instructions for the chosen construction. Inspect each stage before the next layer is placed.

Complete the running finish and markings and carry out the agreed site checks before opening. Installation guidance can be discussed with the supply package.

Full-PU layer application, surface finishing and lane-marking sequence
Supply and delivery

Keep the material references
with the people doing the work.

USAWEGI can discuss running-track materials, drawings and installation guidance. Confirm quantities, packing and destination with the selected order.

Check labels and visible condition when materials arrive. Retain the approved construction and installation records for the receiving and venue teams.

Maintenance and enquiries

Look after the surface
through regular training.

Remove debris, keep water routes clear and inspect high-use areas and edges. Use compatible cleaning and repair methods for the selected finish.

Send the country, track drawing, base photographs, intended sessions and required material tests to discuss a proposal.

Discuss Your Running-Track System
Products
PRODUCTS DETAILS
Non Poisonous IAAF Running Track Systems Full PU Training use
MOQ: 1000 square meters
Price: negotiate
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: L/C,D/A,D/P,T/T,Western Union,
Supply Capacity: 20000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
CE/SGS/ISO
Model Number
AR-FP-02
Product Name:
Full-polyurethane (PU) Track
Application:
Olympic Games, School, Sports Center
Thickness:
13mm
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Installation:
Easy
Maintenance:
Low
Width:
8m
Length:
400m
Surface:
Smooth
UV Resistance:
High
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Resilience:
High
Minimum Order Quantity:
1000 square meters
Price:
negotiate
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
L/C,D/A,D/P,T/T,Western Union,
Supply Ability:
20000 Square Meter Per Week
Highlight

Non Poisonous IAAF Running Track

,

IAAF Running Track Systems

,

Non Poisonous Full PU Running Track

Product Description
Full-PU track systems · Training use

A dedicated track
for the training programme.

Plan the running surface and lane layout around the sessions your venue intends to hold.

Marked red running track used as an athletics-training venue reference

The full-PU option is a layered athletic-surface construction. Select the material schedule, finish and required surface response together with the activities and footwear.

The proposal identifies the track construction and the site preparation and checks required for the project.

Get a Full-PU Training-Track Proposal
Full-polyurethane construction

Keep the supporting layers
and finish in one specification.

The full-PU construction reference shows the granular wearing finish above polyurethane adhesive and sealing layers. Their materials and application schedule are selected as one running system.

The current record lists 13mm for this option. Confirm the layer build-up and quantities with the proposal rather than inferring them from a photograph.

Original full-PU construction with coloured wearing finish and polyurethane layers
Material information for procurement

Know the formulation
and the reports requested for it.

Request the relevant component information and chemical or emissions test records for the offered formulation. Specify the required methods and product reference with the enquiry.

If an athletics approval is required, identify the exact system and relevant documents, along with any installed-venue checks. Keep the selected sample and report references with the order.

Full-PU running-surface sample showing the wearing texture
Venue planning

Connect the training layout
to the prepared foundation.

Review the supporting base, levels, moisture and water routes before surfacing work. The drawing sets the lanes, access and related athletics areas.

For refurbishment, include photographs of the existing track and any worn or damaged locations. Local repairs and preparation are defined separately from the new material supply.

Configuration

Record the full-PU option
for the actual project.

Brand and listed model: USAWEGI / AR-FP-02. Identify the full-PU build-up, selected thickness, finish and colours in the material schedule.

Confirm the component list, application quantities, required tests and handover criteria. The project drawing defines the real track dimensions and layout.

Keep installation instructions and the responsibilities for local preparation and testing together with the quotation.

Installation

Prepare, apply and mark
the selected running system.

Follow the preparation, mixing, application and curing instructions for the chosen construction. Inspect each stage before the next layer is placed.

Complete the running finish and markings and carry out the agreed site checks before opening. Installation guidance can be discussed with the supply package.

Full-PU layer application, surface finishing and lane-marking sequence
Supply and delivery

Keep the material references
with the people doing the work.

USAWEGI can discuss running-track materials, drawings and installation guidance. Confirm quantities, packing and destination with the selected order.

Check labels and visible condition when materials arrive. Retain the approved construction and installation records for the receiving and venue teams.

Maintenance and enquiries

Look after the surface
through regular training.

Remove debris, keep water routes clear and inspect high-use areas and edges. Use compatible cleaning and repair methods for the selected finish.

Send the country, track drawing, base photographs, intended sessions and required material tests to discuss a proposal.

Discuss Your Running-Track System
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.