Send Message
products
PRODUCTS DETAILS
Home > Products >
Non Poisonous IAAF Running Track Systems Full PU Training use

Non Poisonous IAAF Running Track Systems Full PU Training use

MOQ: 1000 Square Meters
Price: USD 15 Square Meter
Standard Packaging: Barrel / Pallet / Bag
Delivery Period: 7 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong, China
Brand Name
ASHER
Certification
CE/SGS/ISO
Model Number
AR-SP-02
Product Name:
Full-polyurethane (PU) Track
Application:
Olympic Games, School, Sports Center
Thickness:
13mm
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Installation:
Easy
Maintenance:
Low
Width:
8m
Length:
400m
Surface:
Smooth
UV Resistance:
High
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Resilience:
High
Minimum Order Quantity:
1000 Square Meters
Price:
USD 15 Square Meter
Packaging Details:
Barrel / Pallet / Bag
Delivery Time:
7 work days
Payment Terms:
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability:
10000 Square Meter Per Week
High Light:

Non Poisonous IAAF Running Track

,

IAAF Running Track Systems

,

Non Poisonous Full PU Running Track

Product Description

Non-poisonous 13mm IAAF Full PU Running Track Runway for Training Center

 

Applications

 

1. Professional type: for athletic field of Olympic, continental championship, professional training.

2. Standard type: for athletic field of high school, university, physical college, sports center, stadium.

3. Conventional type: for athletic field of primary school, high school, college, university, gymnasium.

4. Indoor, outdoor table tennis, basketball, badminton and other kinds of course.

 

Running Track type

 

Plastic type Advantage Shortcoming Surface type
Breathable plastic runway Low cost, breathable and water seepage, acid and alkali resistance.
Black particle base buffer layer, TPE or other environmentally friendly miscellaneous material base buffer layer, EPDM
The base layer has low requirements and moderate elasticity
The slip resistance is worse than the mixed type. Short service life of 1-3 years The rubber content exceeds 13% as the base buffer layer, and the spray surface uses EPDM with a content of 20%
Hybrid Plastic runaway Environmental protection physics are up to standard,
Service life 5-8 years
The thickness is unstable, the material is easy to foam unevenly,
The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
Spray particle type, sprinkle particle type, self-knotting type
All-plastic plastic runway Environmental protection physics are up to standard, after wear and tear
Good remodelability, service life 8-10 years
The thickness is unstable, the material is easy to foam unevenly,
The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
Spray particle type, sprinkle particle type, self-knotting type
Prefabricated plastic runway Good surface effect, environmental protection and odorless,
Good elasticity, service life 8-10 years
High requirements on the foundation, splicing gaps
Easy to crack and warp, production batch color difference
Chemical bottom composite coil, ordinary rubber composite coil,
Homogeneous transparent coil
Sandwich runway Good cushioning, environmentally friendly and odorless,
No cracks, service life 8-10 years
The cost is high, and the requirements for the flatness of the foundation are high PU foam coil buffer layer, TPU mixed EPDM buffer layer,
TPU semi-prefabricated buffer layer

 

 

Package Type

 

1. Packing in barrel, SPU liquid material by 30kg /barrel

2. All of them are packed in small barrels, which is convenient for transportation and can be used immediately.

3.There is no need for specially skilled technicians to complete the paving of plastic runways.

 

 

Advantages of Full PU Running Track

1. All weather suitable: there is no condition to weather and temperature ranged, it still can devote to use after heavy rain.
2. High flexible, cushion and shock absorb: due to Multi-layer system and Rubber granules, the flooring was soft and flexible, which can do an favor for athletes' performance and prevent from injury at the same time.
3. Anti-nail: it won't destroy by the spikes or start running frame even at the starting point of 100-meter.
4. Flatness: special machine for installation, you can adjust the machine make the thickness correspond to clients required.
5. Weather resistance: it won't fade,pulverized or intenerated by ultraviolet radiation, Ozone and the pollution of acid rain, which can keep the fresh color for a long time.
6. Pressing: it can rebound after the heavy equipment.
7. Viscosity: special construction disposal , it ahs the strong Viscosity, which can prevent the ascend of water, no pickle,separating, etc.

 

Full PU Running Track Introduction

 

A full PU (polyurethane) running track is a type of synthetic running surface that is commonly used in athletics tracks, both indoor and outdoor. The track consists of multiple layers, with the top layer being made of a polyurethane material that is applied in liquid form and then hardened into a durable and resilient surface.

 

 

Products Description
 
1. Total system thickness approx.
9-18mm (we recommend 13mm).
Hard-wearing, long-lasting.
Suitable for all-weather and all-season use, with good anti-slip performance.
 
2. Environmental Tartan Track, non-toxic and harmless.
With strong elastic layer and buffer layer, strong impact absorption and high wear resistance coefficient.
Can handle constant toughest stresses by spikes.
 
3. High-quality innovative PU elastic material, high adhesion to the foundation, high cohesive strength, good toughness, mixed with environmentally friendly EPDM colored particles.
It meets IAAF standards and can be used in professional competition venues.
 

Quality requirements for runway foundation

 

Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.


(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.

 

(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜

 

(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.


(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.


(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.

 
Full Pour Athletic Track Construction Steps
 
We can arrange workers to go to the site for construction guidance.
If you are interested, you can contact us now.
 
Non Poisonous IAAF Running Track Systems Full PU Training use 0
Non Poisonous IAAF Running Track Systems Full PU Training use 1
 
Related Certificates
Non Poisonous IAAF Running Track Systems Full PU Training use 2
 
Project case
 
Non Poisonous IAAF Running Track Systems Full PU Training use 3
Non Poisonous IAAF Running Track Systems Full PU Training use 4
Non Poisonous IAAF Running Track Systems Full PU Training use 5
products
PRODUCTS DETAILS
Non Poisonous IAAF Running Track Systems Full PU Training use
MOQ: 1000 Square Meters
Price: USD 15 Square Meter
Standard Packaging: Barrel / Pallet / Bag
Delivery Period: 7 work days
Payment Method: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong, China
Brand Name
ASHER
Certification
CE/SGS/ISO
Model Number
AR-SP-02
Product Name:
Full-polyurethane (PU) Track
Application:
Olympic Games, School, Sports Center
Thickness:
13mm
Ingredients:
Polyurethane, PU And SBR
Service Life:
Eight-twelve Years
Installation:
Easy
Maintenance:
Low
Width:
8m
Length:
400m
Surface:
Smooth
UV Resistance:
High
Weather:
All Weather
Sample:
Free Sample And Freight Self Pay
Resilience:
High
Minimum Order Quantity:
1000 Square Meters
Price:
USD 15 Square Meter
Packaging Details:
Barrel / Pallet / Bag
Delivery Time:
7 work days
Payment Terms:
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability:
10000 Square Meter Per Week
High Light

Non Poisonous IAAF Running Track

,

IAAF Running Track Systems

,

Non Poisonous Full PU Running Track

Product Description

Non-poisonous 13mm IAAF Full PU Running Track Runway for Training Center

 

Applications

 

1. Professional type: for athletic field of Olympic, continental championship, professional training.

2. Standard type: for athletic field of high school, university, physical college, sports center, stadium.

3. Conventional type: for athletic field of primary school, high school, college, university, gymnasium.

4. Indoor, outdoor table tennis, basketball, badminton and other kinds of course.

 

Running Track type

 

Plastic type Advantage Shortcoming Surface type
Breathable plastic runway Low cost, breathable and water seepage, acid and alkali resistance.
Black particle base buffer layer, TPE or other environmentally friendly miscellaneous material base buffer layer, EPDM
The base layer has low requirements and moderate elasticity
The slip resistance is worse than the mixed type. Short service life of 1-3 years The rubber content exceeds 13% as the base buffer layer, and the spray surface uses EPDM with a content of 20%
Hybrid Plastic runaway Environmental protection physics are up to standard,
Service life 5-8 years
The thickness is unstable, the material is easy to foam unevenly,
The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
Spray particle type, sprinkle particle type, self-knotting type
All-plastic plastic runway Environmental protection physics are up to standard, after wear and tear
Good remodelability, service life 8-10 years
The thickness is unstable, the material is easy to foam unevenly,
The volatilization period of TVOC is 6 months, and the plasticizer is easy to exceed the standard
Spray particle type, sprinkle particle type, self-knotting type
Prefabricated plastic runway Good surface effect, environmental protection and odorless,
Good elasticity, service life 8-10 years
High requirements on the foundation, splicing gaps
Easy to crack and warp, production batch color difference
Chemical bottom composite coil, ordinary rubber composite coil,
Homogeneous transparent coil
Sandwich runway Good cushioning, environmentally friendly and odorless,
No cracks, service life 8-10 years
The cost is high, and the requirements for the flatness of the foundation are high PU foam coil buffer layer, TPU mixed EPDM buffer layer,
TPU semi-prefabricated buffer layer

 

 

Package Type

 

1. Packing in barrel, SPU liquid material by 30kg /barrel

2. All of them are packed in small barrels, which is convenient for transportation and can be used immediately.

3.There is no need for specially skilled technicians to complete the paving of plastic runways.

 

 

Advantages of Full PU Running Track

1. All weather suitable: there is no condition to weather and temperature ranged, it still can devote to use after heavy rain.
2. High flexible, cushion and shock absorb: due to Multi-layer system and Rubber granules, the flooring was soft and flexible, which can do an favor for athletes' performance and prevent from injury at the same time.
3. Anti-nail: it won't destroy by the spikes or start running frame even at the starting point of 100-meter.
4. Flatness: special machine for installation, you can adjust the machine make the thickness correspond to clients required.
5. Weather resistance: it won't fade,pulverized or intenerated by ultraviolet radiation, Ozone and the pollution of acid rain, which can keep the fresh color for a long time.
6. Pressing: it can rebound after the heavy equipment.
7. Viscosity: special construction disposal , it ahs the strong Viscosity, which can prevent the ascend of water, no pickle,separating, etc.

 

Full PU Running Track Introduction

 

A full PU (polyurethane) running track is a type of synthetic running surface that is commonly used in athletics tracks, both indoor and outdoor. The track consists of multiple layers, with the top layer being made of a polyurethane material that is applied in liquid form and then hardened into a durable and resilient surface.

 

 

Products Description
 
1. Total system thickness approx.
9-18mm (we recommend 13mm).
Hard-wearing, long-lasting.
Suitable for all-weather and all-season use, with good anti-slip performance.
 
2. Environmental Tartan Track, non-toxic and harmless.
With strong elastic layer and buffer layer, strong impact absorption and high wear resistance coefficient.
Can handle constant toughest stresses by spikes.
 
3. High-quality innovative PU elastic material, high adhesion to the foundation, high cohesive strength, good toughness, mixed with environmentally friendly EPDM colored particles.
It meets IAAF standards and can be used in professional competition venues.
 

Quality requirements for runway foundation

 

Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.


(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.

 

(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜

 

(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.


(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.


(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.

 
Full Pour Athletic Track Construction Steps
 
We can arrange workers to go to the site for construction guidance.
If you are interested, you can contact us now.
 
Non Poisonous IAAF Running Track Systems Full PU Training use 0
Non Poisonous IAAF Running Track Systems Full PU Training use 1
 
Related Certificates
Non Poisonous IAAF Running Track Systems Full PU Training use 2
 
Project case
 
Non Poisonous IAAF Running Track Systems Full PU Training use 3
Non Poisonous IAAF Running Track Systems Full PU Training use 4
Non Poisonous IAAF Running Track Systems Full PU Training use 5
Sitemap |  Privacy Policy | China Good Quality EPDM Rubber Running Track Supplier. Copyright © 2023-2024 rubberrunningtracks.com . All Rights Reserved.