MOQ: | 1000 Square Meters |
Price: | USD 18 Square Meter |
Standard Packaging: | Pallet / Metal Pail |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Thermoplastic Polyurethane Elastomer Rubber Flooring for Smooth, Bright & Clean Surface
Product Name
|
SPU surface sport flooring
|
|||
Thickness
|
3mm, 4mm, 5mm, 6mm, 7mm, 8mm
|
|||
Force Reduction
|
22%
|
|||
Tensile Strength
|
0.88 N/mm2
|
|||
Elongation at Break
|
61%
|
|||
Ball Rebound
|
99%
|
|||
Taber Abrasion
|
0.31 gr
|
Thermoplastic polyurethane elastomer rubber
Product characteristics:
(1) Has good weather resistance and UV resistance;
(2) Has superior weather resistance, strong wear resistance, and excellent stain resistance;
(3) Low compression deformation rate and good elasticity;
(4) Suitable for concrete and asphalt foundations.
Introduction to water-based silicon PU surface layer
The internationally recognized match court is made of Thermoplastic polyurethane elastomer rubber, which does not contain any waste filler, so it can ensure the environmental protection and stability of the product and has good resistance;
Its good elastic performance can reduce the damage caused by ground reaction forces on athletes' ankles, joints, and ligaments;
It is suitable for indoor Basketball court, tennis court, volleyball court, badminton court and other professional competition venues.
Requirements for the ground of the competition venue
1. The ground of the site must be flat, level, and free from sinking cracks.
2. The ground of the venue must not have any potential hazards that could harm team members.
3. Do not compete on rough, wet, or slippery surfaces.
4. The ground of the FIBA World Championship venue can only be made of wood or synthetic materials.
5. If it is an indoor venue, the net height of tennis and volleyball should not be less than 12 meters.
Construction requirements for stadium surface layer
Basic requirements
(1) Cement foundation requirements: no honeycomb, pitted surface, exposed stones, exposed reinforcement, cracks, foundation settlement, etc. Asphalt foundation requirements: The asphalt layer is 5 centimeters thick, and the foundation surface is free from fractures, grinding marks, honeycomb or peeling.
(2) Flatness requirements: The positive and negative error of a 4M ruler is ≤ 5MM, the maintenance period is 28 days, and the foundation surface is free of oil, ash, and dry.
Stadium Standard Specifications
(1) Boundary color: white.
(2) Court color: Different colors are required for the court area and buffer area, with green for the regular home court and red for the secondary court.
(3) The courts are divided into indoor and outdoor types, and indoor courts can be shared with volleyball courts.
(4) Outdoor venues generally require a north-south orientation of the long axis.
Stadium size specifications
1. The size within the main functional line (excluding the functional line) is a standard fixed size;
2. The overall size of the site can be adjusted ± according to the actual situation on site;
3. If the site size is limited, separate drawings can be provided according to the actual situation.
Completion acceptance
(1) After the completion of the pavement construction of the water-based silicon PU stadium surface, draw the completion drawing.
(2) Organize construction operation records and write a construction summary.
(3) Conduct a comprehensive acceptance of the water-based silicon PU project together with Party A, and promptly rectify the specific issues
raised during the acceptance based on the principle of "user first" to ensure user satisfaction and provide after-sales service.
MOQ: | 1000 Square Meters |
Price: | USD 18 Square Meter |
Standard Packaging: | Pallet / Metal Pail |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Thermoplastic Polyurethane Elastomer Rubber Flooring for Smooth, Bright & Clean Surface
Product Name
|
SPU surface sport flooring
|
|||
Thickness
|
3mm, 4mm, 5mm, 6mm, 7mm, 8mm
|
|||
Force Reduction
|
22%
|
|||
Tensile Strength
|
0.88 N/mm2
|
|||
Elongation at Break
|
61%
|
|||
Ball Rebound
|
99%
|
|||
Taber Abrasion
|
0.31 gr
|
Thermoplastic polyurethane elastomer rubber
Product characteristics:
(1) Has good weather resistance and UV resistance;
(2) Has superior weather resistance, strong wear resistance, and excellent stain resistance;
(3) Low compression deformation rate and good elasticity;
(4) Suitable for concrete and asphalt foundations.
Introduction to water-based silicon PU surface layer
The internationally recognized match court is made of Thermoplastic polyurethane elastomer rubber, which does not contain any waste filler, so it can ensure the environmental protection and stability of the product and has good resistance;
Its good elastic performance can reduce the damage caused by ground reaction forces on athletes' ankles, joints, and ligaments;
It is suitable for indoor Basketball court, tennis court, volleyball court, badminton court and other professional competition venues.
Requirements for the ground of the competition venue
1. The ground of the site must be flat, level, and free from sinking cracks.
2. The ground of the venue must not have any potential hazards that could harm team members.
3. Do not compete on rough, wet, or slippery surfaces.
4. The ground of the FIBA World Championship venue can only be made of wood or synthetic materials.
5. If it is an indoor venue, the net height of tennis and volleyball should not be less than 12 meters.
Construction requirements for stadium surface layer
Basic requirements
(1) Cement foundation requirements: no honeycomb, pitted surface, exposed stones, exposed reinforcement, cracks, foundation settlement, etc. Asphalt foundation requirements: The asphalt layer is 5 centimeters thick, and the foundation surface is free from fractures, grinding marks, honeycomb or peeling.
(2) Flatness requirements: The positive and negative error of a 4M ruler is ≤ 5MM, the maintenance period is 28 days, and the foundation surface is free of oil, ash, and dry.
Stadium Standard Specifications
(1) Boundary color: white.
(2) Court color: Different colors are required for the court area and buffer area, with green for the regular home court and red for the secondary court.
(3) The courts are divided into indoor and outdoor types, and indoor courts can be shared with volleyball courts.
(4) Outdoor venues generally require a north-south orientation of the long axis.
Stadium size specifications
1. The size within the main functional line (excluding the functional line) is a standard fixed size;
2. The overall size of the site can be adjusted ± according to the actual situation on site;
3. If the site size is limited, separate drawings can be provided according to the actual situation.
Completion acceptance
(1) After the completion of the pavement construction of the water-based silicon PU stadium surface, draw the completion drawing.
(2) Organize construction operation records and write a construction summary.
(3) Conduct a comprehensive acceptance of the water-based silicon PU project together with Party A, and promptly rectify the specific issues
raised during the acceptance based on the principle of "user first" to ensure user satisfaction and provide after-sales service.