| MOQ: | 1000 square meters |
| Price: | Negotiation |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
Give the volleyball area a continuous silicon PU playing finish built over a prepared substrate. SPU-08B is selected through its coating layers, surface texture and compatible primer or adhesive, with the court colours and markings completing the layout.

The continuous coating brings the court colour and contrasting volleyball lines into one readable layout. A finish sample lets the venue compare its appearance and contact texture with the intended indoor or outdoor use.
A smooth court plane depends on the supporting substrate as well as the applied finish. Repair depressions and defects before the coating sequence starts, then keep the selected texture consistent with the system instructions.

The product record lists silicon PU material and thickness options from 3 to 8 mm. The actual layer allocation, material quantities and wearing finish need to identify the option selected for the venue.
Compatible primer, elastic construction and top finish have different roles. Keep the component references together so the site crew applies materials intended to work as the same floor system.

Check substrate strength, flatness, moisture and cracks before the floor materials are applied. The chosen primer or adhesive follows the condition of that base and the supplied coating instructions.
For an outdoor court, levels and collection points form part of the water route. Repairing the foundation and keeping outlets clear helps the finish become a serviceable part of the facility.

Prepare and mix the supplied components as directed, then apply the selected stages at their specified material consumption. Protect each layer from contamination and unsuitable weather while it develops the required condition for the next coat.
Set out volleyball markings after the finish is ready for that operation. Opening to play follows the supplied curing instructions and final checks for the completed court.
Remove grit and debris, clean with products compatible with the finish and inspect entrances, perimeter edges and frequently used zones. Local repairs should use materials suitable for the installed silicon PU construction.
Retain the approved sample, component references and application record. They provide a useful basis for maintenance enquiries and later surface renewal.
Send the court dimensions, location, base photographs, indoor or outdoor setting and desired colours. USAWEGI can discuss the selected layer build, material quantities, packing and installation guidance for your volleyball facility.
Any required performance or material documents should identify the offered construction. Warranty coverage, site services and shipment arrangements are recorded for the actual order.
| MOQ: | 1000 square meters |
| Price: | Negotiation |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | L/C,D/A,D/P,T/T,Western Union, |
Give the volleyball area a continuous silicon PU playing finish built over a prepared substrate. SPU-08B is selected through its coating layers, surface texture and compatible primer or adhesive, with the court colours and markings completing the layout.

The continuous coating brings the court colour and contrasting volleyball lines into one readable layout. A finish sample lets the venue compare its appearance and contact texture with the intended indoor or outdoor use.
A smooth court plane depends on the supporting substrate as well as the applied finish. Repair depressions and defects before the coating sequence starts, then keep the selected texture consistent with the system instructions.

The product record lists silicon PU material and thickness options from 3 to 8 mm. The actual layer allocation, material quantities and wearing finish need to identify the option selected for the venue.
Compatible primer, elastic construction and top finish have different roles. Keep the component references together so the site crew applies materials intended to work as the same floor system.

Check substrate strength, flatness, moisture and cracks before the floor materials are applied. The chosen primer or adhesive follows the condition of that base and the supplied coating instructions.
For an outdoor court, levels and collection points form part of the water route. Repairing the foundation and keeping outlets clear helps the finish become a serviceable part of the facility.

Prepare and mix the supplied components as directed, then apply the selected stages at their specified material consumption. Protect each layer from contamination and unsuitable weather while it develops the required condition for the next coat.
Set out volleyball markings after the finish is ready for that operation. Opening to play follows the supplied curing instructions and final checks for the completed court.
Remove grit and debris, clean with products compatible with the finish and inspect entrances, perimeter edges and frequently used zones. Local repairs should use materials suitable for the installed silicon PU construction.
Retain the approved sample, component references and application record. They provide a useful basis for maintenance enquiries and later surface renewal.
Send the court dimensions, location, base photographs, indoor or outdoor setting and desired colours. USAWEGI can discuss the selected layer build, material quantities, packing and installation guidance for your volleyball facility.
Any required performance or material documents should identify the offered construction. Warranty coverage, site services and shipment arrangements are recorded for the actual order.