MOQ: | 300Ssqms |
Price: | Negotiable |
Standard Packaging: | Pallet |
Delivery Period: | 7-10 days after your deposit |
Payment Method: | L/C, T/T, Moneygram, Paypal, Western Union |
Supply Capacity: | 10000 sq.m per Month |
The semi-prefabricated plastic runway has many remarkable characteristics, such as being an all-weather pavement, having excellent elasticity, excellent anti-skid property, good scalability and nail resistance, wear resistance, and having superior stability.
Furthermore, it meets the IAAF standard, has excellent flatness, a clean taste, is green and environmentally friendly, and has a much better elasticity than the new national standard. It can be used around the clock, has strong wear resistance, good weather resistance, strong compression resistance, good elasticity, good impact absorption, strong nail resistance, flatness, good adhesion and durability.
Additionally, it can be constructed and installed quickly and easily, and restoration to its original bright colors is possible after simple washing and rinsing with water. Finally, it is dust-proof, aseptic and easy to maintain, making it a friendly and beneficial addition to the environment.
Semi-prefabricated runway composition materials mainly consist of four parts.
The bottom adhesive layer provides a good bonding effect. Then, a TPU elastic layer is added. Not too soft or too hard, just the right balance to be able to withstand certain pressure.
The third layer is the silicon PU layer, protecting the bottom layer and enhancing the durability and stability.
Finally, the anti-slip surface layer, which can be in the form of particle spray surface or self-knotted grain spray surface, is applied to ensure safety when exercising.
The semi-prefabricated plastic runway construction process includes several steps:
1. Begin by making sure the foundation is flat and vertical and horizontal slopes meet the stadium drainage requirements. Pre-lay lines for the site's foundation.
2. Place required rolls of material in length units along the lines in the part of the runway that will be laid that day.
3. Prepare base adhesive onsite within one hour.
4. Use a special cart to take adhesive away from its place of preparation and spread it out evenly.
5. Lay out the material and spread the adhesive, lay the material flat and spread it out along lines, then use a special roller to compact it.
6. Apply polyurethane elastic material to the laid TPU coil, mix it according to the exact ratio, and spread the surface reinforcement layer to the required thickness.
7. When the reinforcement layer is cured, mix the surface glue and glue. Use a runway sprayer to spread it out over the entire area.
8. After the surface is completely dry, delineate the runway boundaries and clear the area.
ASHER AR-SP-01 Sandwich System Running Track is a high quality track system designed for providing excellent shock absorption and UV resistance. It is produced in Guangzhou, China with SGS and ISO certifications, and is available in minimum order quantity of 300sqms. The price is negotiable and it is packed in pallets. The delivery time is 7-10 days after your deposit, and payment terms include L/C, T/T, Moneygram, Paypal, and Western Union. The supply ability is 10000 sq.m per Month, and the color is black. The size is customized and the UV resistance is excellent, and the shock absorption is high.
Welcome to ASHER, your reliable and trustworthy supplier of eco-friendly and low maintenance Sandwich System Running Tracks. Our model number AR-SP-01 is a sandwich running track that offers excellent weather resistance and high shock absorption. With a minimum order quantity of 300Ssqms, this running track has a flexible material of rubber, and has been certified by SGS and ISO. The price is negotiable and it comes with a packaging of pallet. Delivery takes 7 to 10 days after your deposit, and payment can be made via L/C, T/T, Moneygram, Paypal, or Western Union. We have a supply ability of 10,000 sq.m per month.
MOQ: | 300Ssqms |
Price: | Negotiable |
Standard Packaging: | Pallet |
Delivery Period: | 7-10 days after your deposit |
Payment Method: | L/C, T/T, Moneygram, Paypal, Western Union |
Supply Capacity: | 10000 sq.m per Month |
The semi-prefabricated plastic runway has many remarkable characteristics, such as being an all-weather pavement, having excellent elasticity, excellent anti-skid property, good scalability and nail resistance, wear resistance, and having superior stability.
Furthermore, it meets the IAAF standard, has excellent flatness, a clean taste, is green and environmentally friendly, and has a much better elasticity than the new national standard. It can be used around the clock, has strong wear resistance, good weather resistance, strong compression resistance, good elasticity, good impact absorption, strong nail resistance, flatness, good adhesion and durability.
Additionally, it can be constructed and installed quickly and easily, and restoration to its original bright colors is possible after simple washing and rinsing with water. Finally, it is dust-proof, aseptic and easy to maintain, making it a friendly and beneficial addition to the environment.
Semi-prefabricated runway composition materials mainly consist of four parts.
The bottom adhesive layer provides a good bonding effect. Then, a TPU elastic layer is added. Not too soft or too hard, just the right balance to be able to withstand certain pressure.
The third layer is the silicon PU layer, protecting the bottom layer and enhancing the durability and stability.
Finally, the anti-slip surface layer, which can be in the form of particle spray surface or self-knotted grain spray surface, is applied to ensure safety when exercising.
The semi-prefabricated plastic runway construction process includes several steps:
1. Begin by making sure the foundation is flat and vertical and horizontal slopes meet the stadium drainage requirements. Pre-lay lines for the site's foundation.
2. Place required rolls of material in length units along the lines in the part of the runway that will be laid that day.
3. Prepare base adhesive onsite within one hour.
4. Use a special cart to take adhesive away from its place of preparation and spread it out evenly.
5. Lay out the material and spread the adhesive, lay the material flat and spread it out along lines, then use a special roller to compact it.
6. Apply polyurethane elastic material to the laid TPU coil, mix it according to the exact ratio, and spread the surface reinforcement layer to the required thickness.
7. When the reinforcement layer is cured, mix the surface glue and glue. Use a runway sprayer to spread it out over the entire area.
8. After the surface is completely dry, delineate the runway boundaries and clear the area.
ASHER AR-SP-01 Sandwich System Running Track is a high quality track system designed for providing excellent shock absorption and UV resistance. It is produced in Guangzhou, China with SGS and ISO certifications, and is available in minimum order quantity of 300sqms. The price is negotiable and it is packed in pallets. The delivery time is 7-10 days after your deposit, and payment terms include L/C, T/T, Moneygram, Paypal, and Western Union. The supply ability is 10000 sq.m per Month, and the color is black. The size is customized and the UV resistance is excellent, and the shock absorption is high.
Welcome to ASHER, your reliable and trustworthy supplier of eco-friendly and low maintenance Sandwich System Running Tracks. Our model number AR-SP-01 is a sandwich running track that offers excellent weather resistance and high shock absorption. With a minimum order quantity of 300Ssqms, this running track has a flexible material of rubber, and has been certified by SGS and ISO. The price is negotiable and it comes with a packaging of pallet. Delivery takes 7 to 10 days after your deposit, and payment can be made via L/C, T/T, Moneygram, Paypal, or Western Union. We have a supply ability of 10,000 sq.m per month.