Does integrated structure mean the same thing as prefabricated?
No. Ask how the specific system is supplied and installed. A layered system can be assembled or applied on site.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Rubber granules in bags; PU binders and surface coatings in drums. |
| Delivery Period: | 15-30 days for actual products, depending on project size and order requirements. Samples can be arranged promptly. |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 20000 sq.m per Month |
01 / RUNNING TRACK SURFACING
This sandwich system is positioned around a durable outdoor athletic surface. The wearing finish and its underlying support are selected together for regular track use.
02 / RUNNING TRACK SURFACING
The surface is coordinated with rainfall, sunlight and the site drainage. Application conditions and routine care support the outdoor service plan.
03 / RUNNING TRACK SURFACING
The elastic lower layer, sealing layer and wearing surface form one specified construction. Review the layer interfaces and materials together when choosing the final build-up.
A sandwich running track built around an integrated elastic base, intermediate sealing layer and wear-resistant top surface. The relationship between the layers is central to durability and outdoor service. Specify the complete build-up for the venue, with drainage, interfaces and maintenance planned together.
For buyers comparing sandwich-track constructions where the continuity and relationship of layers matter more than a single headline property.
The physical sample shows surface texture and construction details that a distant venue photograph cannot. Compare the selected finish with the activity and care requirements.
Coordinate lanes, bends, markings and access transitions around the venue layout. Resolve the connection to adjacent surfaces and drainage before the running finish is installed.
Coordinate surface falls, base drainage and outlet positions for the selected track system. Resolve edges and connections before applying the running surface.
Compare the available finish samples with the venue colour plan. Approve the selected material and marking contrast before bulk ordering and staged application.
The installation sequence connects preparation, positioning or material application, finishing and inspection. Follow the selected system instructions and respect the required curing conditions.
Separate the material configuration, packing, transport and local works in the supply proposal. Define the components and responsibilities before comparing complete project quotations.
PRODUCT CONFIGURATION
Listed specifications; confirm the selected construction in the quotation.
| Place of Origin | Guangdong,China |
|---|---|
| Model Number | AR-SP-01 |
| Surface | Smooth |
| Structure | Integrated |
| UV Resistance | Excellent |
| Material | Rubber |
| Durability | High |
| Weather Resistance | Excellent |
| Color | Black |
Remove debris, manage surface contamination and keep drainage clear. Inspect high-use areas, edges and markings, and repair damage using the selected system’s compatible method.
No. Ask how the specific system is supplied and installed. A layered system can be assembled or applied on site.
Provide the area, layout, base type, required construction, colours, site location and acceptance standard. Distinguish materials, base repairs, installation and testing in the scope.
Send the following details for a matched material and supply proposal.
|
|
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Rubber granules in bags; PU binders and surface coatings in drums. |
| Delivery Period: | 15-30 days for actual products, depending on project size and order requirements. Samples can be arranged promptly. |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 20000 sq.m per Month |
01 / RUNNING TRACK SURFACING
This sandwich system is positioned around a durable outdoor athletic surface. The wearing finish and its underlying support are selected together for regular track use.
02 / RUNNING TRACK SURFACING
The surface is coordinated with rainfall, sunlight and the site drainage. Application conditions and routine care support the outdoor service plan.
03 / RUNNING TRACK SURFACING
The elastic lower layer, sealing layer and wearing surface form one specified construction. Review the layer interfaces and materials together when choosing the final build-up.
A sandwich running track built around an integrated elastic base, intermediate sealing layer and wear-resistant top surface. The relationship between the layers is central to durability and outdoor service. Specify the complete build-up for the venue, with drainage, interfaces and maintenance planned together.
For buyers comparing sandwich-track constructions where the continuity and relationship of layers matter more than a single headline property.
The physical sample shows surface texture and construction details that a distant venue photograph cannot. Compare the selected finish with the activity and care requirements.
Coordinate lanes, bends, markings and access transitions around the venue layout. Resolve the connection to adjacent surfaces and drainage before the running finish is installed.
Coordinate surface falls, base drainage and outlet positions for the selected track system. Resolve edges and connections before applying the running surface.
Compare the available finish samples with the venue colour plan. Approve the selected material and marking contrast before bulk ordering and staged application.
The installation sequence connects preparation, positioning or material application, finishing and inspection. Follow the selected system instructions and respect the required curing conditions.
Separate the material configuration, packing, transport and local works in the supply proposal. Define the components and responsibilities before comparing complete project quotations.
PRODUCT CONFIGURATION
Listed specifications; confirm the selected construction in the quotation.
| Place of Origin | Guangdong,China |
|---|---|
| Model Number | AR-SP-01 |
| Surface | Smooth |
| Structure | Integrated |
| UV Resistance | Excellent |
| Material | Rubber |
| Durability | High |
| Weather Resistance | Excellent |
| Color | Black |
Remove debris, manage surface contamination and keep drainage clear. Inspect high-use areas, edges and markings, and repair damage using the selected system’s compatible method.
No. Ask how the specific system is supplied and installed. A layered system can be assembled or applied on site.
Provide the area, layout, base type, required construction, colours, site location and acceptance standard. Distinguish materials, base repairs, installation and testing in the scope.
Send the following details for a matched material and supply proposal.