| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 20000 sq.m per Month |
AR-SP-13 combines a prefabricated component with the selected PU coating and EPDM wearing finish. The semi prefabricated build links what is supplied in formed material with the bonding and finishing stages carried out at the school or training venue.
For a school or training project, this provides a defined construction to carry from procurement into installation: the support below, the running texture above and the connections between them.

The supplied prefabricated component forms part of the underlying construction. Bonding and the selected on-site coating sequence bring that component into the finished track.
The top layer gives the running area its visible texture and colour. A section sample helps the buyer see the different material roles before the component schedule is finalised.
A well-defined track specification is useful only when the installation follows it. Checks at the prepared base, bonded component, completed finish and lane markings connect the material order with the delivered surface.
For projects with named performance requirements, the relevant product reports and installed-surface acceptance checks are included in the project brief. They refer to the selected construction and actual venue.

The athletics plan identifies lane lines, starts, bends and the interfaces with adjacent activity areas. The selected sample defines the surface texture and colour used across that layout.
Send the field dimensions and intended uses together. The proposal can then match component quantities to the track area and any connected training zones.
The product record identifies model AR-SP-13 with PU coating, a prefabricated component and EPDM granules. The offered thickness and construction are written into the material schedule.
A complete proposal identifies the prepared base, compatible bonding, formed component and finishing materials. Colour selection and test requirements stay attached to the same system.
Base preparation and repair come before the prefabricated component is positioned and bonded. The crew then completes the specified surface work, curing and sports lines.
The installation instructions identify suitable application conditions for the selected materials. Component identification remains with the team during the work and at handover.
USAWEGI can discuss material quantities, packing, delivery and installation guidance. At receipt, the contractor can check the supplied components against the agreed material list.
In use, clear grit and debris, maintain water outlets and inspect the track edges and high-traffic areas. Keep the supplied system reference for compatible repairs and later maintenance.
How is the required standard agreed? Share the project specification and named tests so the offered materials and acceptance plan address the same requirements.
Can the finish be customised? The available colour and configuration choices are discussed with the sample and venue drawing.
Send the country, track plan, base photographs and performance brief for an AR-SP-13 component and quantity proposal.
Get a Semi-Prefabricated Track Proposal
|
|
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 20000 sq.m per Month |
AR-SP-13 combines a prefabricated component with the selected PU coating and EPDM wearing finish. The semi prefabricated build links what is supplied in formed material with the bonding and finishing stages carried out at the school or training venue.
For a school or training project, this provides a defined construction to carry from procurement into installation: the support below, the running texture above and the connections between them.

The supplied prefabricated component forms part of the underlying construction. Bonding and the selected on-site coating sequence bring that component into the finished track.
The top layer gives the running area its visible texture and colour. A section sample helps the buyer see the different material roles before the component schedule is finalised.
A well-defined track specification is useful only when the installation follows it. Checks at the prepared base, bonded component, completed finish and lane markings connect the material order with the delivered surface.
For projects with named performance requirements, the relevant product reports and installed-surface acceptance checks are included in the project brief. They refer to the selected construction and actual venue.

The athletics plan identifies lane lines, starts, bends and the interfaces with adjacent activity areas. The selected sample defines the surface texture and colour used across that layout.
Send the field dimensions and intended uses together. The proposal can then match component quantities to the track area and any connected training zones.
The product record identifies model AR-SP-13 with PU coating, a prefabricated component and EPDM granules. The offered thickness and construction are written into the material schedule.
A complete proposal identifies the prepared base, compatible bonding, formed component and finishing materials. Colour selection and test requirements stay attached to the same system.
Base preparation and repair come before the prefabricated component is positioned and bonded. The crew then completes the specified surface work, curing and sports lines.
The installation instructions identify suitable application conditions for the selected materials. Component identification remains with the team during the work and at handover.
USAWEGI can discuss material quantities, packing, delivery and installation guidance. At receipt, the contractor can check the supplied components against the agreed material list.
In use, clear grit and debris, maintain water outlets and inspect the track edges and high-traffic areas. Keep the supplied system reference for compatible repairs and later maintenance.
How is the required standard agreed? Share the project specification and named tests so the offered materials and acceptance plan address the same requirements.
Can the finish be customised? The available colour and configuration choices are discussed with the sample and venue drawing.
Send the country, track plan, base photographs and performance brief for an AR-SP-13 component and quantity proposal.
Get a Semi-Prefabricated Track Proposal