logo
Products
PRODUCTS DETAILS
Home > Products >
High Friction IAAF Running Track For Bituminous Concrete Base Free Sample

High Friction IAAF Running Track For Bituminous Concrete Base Free Sample

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,D/P,D/A,L/C,Western Union
Supply Capacity: 10000 square meter per week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
WA / Labosports / IAAF
Model Number
Full Polyurethane Rubber Running Track
Surface:
All-Weather
Base Requirement:
Cement Concrete Or Bituminous Concrete
Other:
Drainage And UV Resistance
Sample:
Free Sample
Thickness:
13mm
Shock Absorptionness:
35% To 50%
Service Life:
Eight-twelve Years
Friction:
High
Highlight:

Bituminous Concrete Base IAAF Running Track

,

Free Sample IAAF Running Track

,

High Friction IAAF Running Track

Product Description
Textured full-PU track · Bituminous concrete base

A textured running finish
for your prepared asphalt base.

Plan a full-polyurethane running surface with the finish and base requirements in one project specification.

Completed school running track used as a full-PU venue reference

For a venue with a bituminous-concrete foundation, surfacing starts with the existing levels, condition and preparation. The selected running finish is then built onto that prepared base.

Request a material sample to compare the texture and colour before deciding on the track construction.

Request a Track Sample and Proposal
Surface grip and texture

See the textured finish.
Specify the required friction checks.

The granular wearing finish forms the surface runners contact. Compare the sample texture with the intended activities and footwear.

For a defined friction requirement, identify the test method and applicable condition in the project specification. A photo or a sample feel does not establish a measured result for the installed track.

Blue full-PU running-surface sample showing its granular finish
Bituminous-concrete preparation

Make the foundation
ready for the selected surface.

Inspect the asphalt base for condition, levels, cleanliness and required repairs before the running layers are applied. Check the site water routes as part of the same work.

The selected preparation and application instructions define the interface between the base and the full-PU surface. Keep that sequence with the installer.

Original installation photograph showing asphalt-base sealing before track application
Full-PU construction

Keep the wearing finish
and supporting layers coordinated.

The original full-PU diagram identifies EPDM granules, the PU adhesive layer and the PU sealing layer. These components are specified as one running-surface construction.

The listed 13mm option is confirmed with the project layer schedule and material quantities. Other pictured track categories are not substituted for the selected full-PU system.

Original full-PU diagram showing the EPDM finish and polyurethane layers
Sample and project documents

Use the sample
to start a clear comparison.

Ask about the advertised free-sample offer and share the destination so availability and dispatch arrangements can be confirmed. Keep the sample reference with the proposed construction.

If athletics approval or a particular test standard is required, request applicable documents for the exact offered system. State the site-testing and handover requirements with the project.

Edge detail of a full-PU running-surface sample
Configuration

Define the foundation
and running surface together.

Brand / model USAWEGI / Full Polyurethane Rubber Running Track
Listed thickness 13mm, with the agreed construction schedule
Base reference Prepared bituminous concrete; cement-concrete projects discussed where applicable
Wearing finish Selected EPDM-granule texture and colour
Sample Availability and dispatch arrangements confirmed with the enquiry
Friction and other tests Required methods and acceptance criteria identified for the project
Supply contents Materials, quantities, packing and delivery terms stated in the quotation
Installation

Prepare, apply and finish.
Then complete the track markings.

The local team follows the specified base preparation and material application sequence. Check each stage and respect the curing conditions before further work.

Apply the selected wearing finish, complete the layout markings and carry out the agreed acceptance checks before reopening.

Full-PU running-track preparation, application, finishing and marking sequence
Material supply

Keep the order clear
for the people on site.

USAWEGI can discuss full-PU track materials, the project drawing and installation guidance. Send the dimensions, base photographs and required standard with the enquiry.

Confirm component identification, packing and receiving checks with the order. Installation, local base repairs and testing responsibilities are recorded in the project plan.

Running-track materials packed in drums for delivery
Care and common questions

Keep the finish
ready for repeated running.

Remove debris, maintain water outlets and inspect edges and worn areas. Clean with a method suitable for the finish and arrange repairs when needed.

Can this be discussed for an asphalt base?

Yes. Send the base condition and levels for review with the selected preparation instructions.

Does the sample prove a friction rating?

A rating requires the relevant test result and applicable conditions.

What athletics documents should the project request?

Request the applicable documents for the proposed system and any required venue checks.

What should I send for a proposal?

Country, track drawing, asphalt-base photographs, intended activities and required acceptance tests.

Discuss Your Asphalt-Base Running Track
Products
PRODUCTS DETAILS
High Friction IAAF Running Track For Bituminous Concrete Base Free Sample
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,D/P,D/A,L/C,Western Union
Supply Capacity: 10000 square meter per week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
WA / Labosports / IAAF
Model Number
Full Polyurethane Rubber Running Track
Surface:
All-Weather
Base Requirement:
Cement Concrete Or Bituminous Concrete
Other:
Drainage And UV Resistance
Sample:
Free Sample
Thickness:
13mm
Shock Absorptionness:
35% To 50%
Service Life:
Eight-twelve Years
Friction:
High
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
T/T,D/P,D/A,L/C,Western Union
Supply Ability:
10000 square meter per week
Highlight

Bituminous Concrete Base IAAF Running Track

,

Free Sample IAAF Running Track

,

High Friction IAAF Running Track

Product Description
Textured full-PU track · Bituminous concrete base

A textured running finish
for your prepared asphalt base.

Plan a full-polyurethane running surface with the finish and base requirements in one project specification.

Completed school running track used as a full-PU venue reference

For a venue with a bituminous-concrete foundation, surfacing starts with the existing levels, condition and preparation. The selected running finish is then built onto that prepared base.

Request a material sample to compare the texture and colour before deciding on the track construction.

Request a Track Sample and Proposal
Surface grip and texture

See the textured finish.
Specify the required friction checks.

The granular wearing finish forms the surface runners contact. Compare the sample texture with the intended activities and footwear.

For a defined friction requirement, identify the test method and applicable condition in the project specification. A photo or a sample feel does not establish a measured result for the installed track.

Blue full-PU running-surface sample showing its granular finish
Bituminous-concrete preparation

Make the foundation
ready for the selected surface.

Inspect the asphalt base for condition, levels, cleanliness and required repairs before the running layers are applied. Check the site water routes as part of the same work.

The selected preparation and application instructions define the interface between the base and the full-PU surface. Keep that sequence with the installer.

Original installation photograph showing asphalt-base sealing before track application
Full-PU construction

Keep the wearing finish
and supporting layers coordinated.

The original full-PU diagram identifies EPDM granules, the PU adhesive layer and the PU sealing layer. These components are specified as one running-surface construction.

The listed 13mm option is confirmed with the project layer schedule and material quantities. Other pictured track categories are not substituted for the selected full-PU system.

Original full-PU diagram showing the EPDM finish and polyurethane layers
Sample and project documents

Use the sample
to start a clear comparison.

Ask about the advertised free-sample offer and share the destination so availability and dispatch arrangements can be confirmed. Keep the sample reference with the proposed construction.

If athletics approval or a particular test standard is required, request applicable documents for the exact offered system. State the site-testing and handover requirements with the project.

Edge detail of a full-PU running-surface sample
Configuration

Define the foundation
and running surface together.

Brand / model USAWEGI / Full Polyurethane Rubber Running Track
Listed thickness 13mm, with the agreed construction schedule
Base reference Prepared bituminous concrete; cement-concrete projects discussed where applicable
Wearing finish Selected EPDM-granule texture and colour
Sample Availability and dispatch arrangements confirmed with the enquiry
Friction and other tests Required methods and acceptance criteria identified for the project
Supply contents Materials, quantities, packing and delivery terms stated in the quotation
Installation

Prepare, apply and finish.
Then complete the track markings.

The local team follows the specified base preparation and material application sequence. Check each stage and respect the curing conditions before further work.

Apply the selected wearing finish, complete the layout markings and carry out the agreed acceptance checks before reopening.

Full-PU running-track preparation, application, finishing and marking sequence
Material supply

Keep the order clear
for the people on site.

USAWEGI can discuss full-PU track materials, the project drawing and installation guidance. Send the dimensions, base photographs and required standard with the enquiry.

Confirm component identification, packing and receiving checks with the order. Installation, local base repairs and testing responsibilities are recorded in the project plan.

Running-track materials packed in drums for delivery
Care and common questions

Keep the finish
ready for repeated running.

Remove debris, maintain water outlets and inspect edges and worn areas. Clean with a method suitable for the finish and arrange repairs when needed.

Can this be discussed for an asphalt base?

Yes. Send the base condition and levels for review with the selected preparation instructions.

Does the sample prove a friction rating?

A rating requires the relevant test result and applicable conditions.

What athletics documents should the project request?

Request the applicable documents for the proposed system and any required venue checks.

What should I send for a proposal?

Country, track drawing, asphalt-base photographs, intended activities and required acceptance tests.

Discuss Your Asphalt-Base Running Track
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.