| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | T/T,D/P,D/A,L/C,Western Union |
| Supply Capacity: | 10000 square meter per week |
Plan a full-polyurethane running surface with the finish and base requirements in one project specification.

For a venue with a bituminous-concrete foundation, surfacing starts with the existing levels, condition and preparation. The selected running finish is then built onto that prepared base.
Request a material sample to compare the texture and colour before deciding on the track construction.
Request a Track Sample and ProposalThe granular wearing finish forms the surface runners contact. Compare the sample texture with the intended activities and footwear.
For a defined friction requirement, identify the test method and applicable condition in the project specification. A photo or a sample feel does not establish a measured result for the installed track.

Inspect the asphalt base for condition, levels, cleanliness and required repairs before the running layers are applied. Check the site water routes as part of the same work.
The selected preparation and application instructions define the interface between the base and the full-PU surface. Keep that sequence with the installer.

The original full-PU diagram identifies EPDM granules, the PU adhesive layer and the PU sealing layer. These components are specified as one running-surface construction.
The listed 13mm option is confirmed with the project layer schedule and material quantities. Other pictured track categories are not substituted for the selected full-PU system.

Ask about the advertised free-sample offer and share the destination so availability and dispatch arrangements can be confirmed. Keep the sample reference with the proposed construction.
If athletics approval or a particular test standard is required, request applicable documents for the exact offered system. State the site-testing and handover requirements with the project.

| Brand / model | USAWEGI / Full Polyurethane Rubber Running Track |
|---|---|
| Listed thickness | 13mm, with the agreed construction schedule |
| Base reference | Prepared bituminous concrete; cement-concrete projects discussed where applicable |
| Wearing finish | Selected EPDM-granule texture and colour |
| Sample | Availability and dispatch arrangements confirmed with the enquiry |
| Friction and other tests | Required methods and acceptance criteria identified for the project |
| Supply contents | Materials, quantities, packing and delivery terms stated in the quotation |
The local team follows the specified base preparation and material application sequence. Check each stage and respect the curing conditions before further work.
Apply the selected wearing finish, complete the layout markings and carry out the agreed acceptance checks before reopening.

USAWEGI can discuss full-PU track materials, the project drawing and installation guidance. Send the dimensions, base photographs and required standard with the enquiry.
Confirm component identification, packing and receiving checks with the order. Installation, local base repairs and testing responsibilities are recorded in the project plan.

Remove debris, maintain water outlets and inspect edges and worn areas. Clean with a method suitable for the finish and arrange repairs when needed.
Yes. Send the base condition and levels for review with the selected preparation instructions.
A rating requires the relevant test result and applicable conditions.
Request the applicable documents for the proposed system and any required venue checks.
Country, track drawing, asphalt-base photographs, intended activities and required acceptance tests.
|
|
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | barrrel |
| Delivery Period: | within 15 days after balance |
| Payment Method: | T/T,D/P,D/A,L/C,Western Union |
| Supply Capacity: | 10000 square meter per week |
Plan a full-polyurethane running surface with the finish and base requirements in one project specification.

For a venue with a bituminous-concrete foundation, surfacing starts with the existing levels, condition and preparation. The selected running finish is then built onto that prepared base.
Request a material sample to compare the texture and colour before deciding on the track construction.
Request a Track Sample and ProposalThe granular wearing finish forms the surface runners contact. Compare the sample texture with the intended activities and footwear.
For a defined friction requirement, identify the test method and applicable condition in the project specification. A photo or a sample feel does not establish a measured result for the installed track.

Inspect the asphalt base for condition, levels, cleanliness and required repairs before the running layers are applied. Check the site water routes as part of the same work.
The selected preparation and application instructions define the interface between the base and the full-PU surface. Keep that sequence with the installer.

The original full-PU diagram identifies EPDM granules, the PU adhesive layer and the PU sealing layer. These components are specified as one running-surface construction.
The listed 13mm option is confirmed with the project layer schedule and material quantities. Other pictured track categories are not substituted for the selected full-PU system.

Ask about the advertised free-sample offer and share the destination so availability and dispatch arrangements can be confirmed. Keep the sample reference with the proposed construction.
If athletics approval or a particular test standard is required, request applicable documents for the exact offered system. State the site-testing and handover requirements with the project.

| Brand / model | USAWEGI / Full Polyurethane Rubber Running Track |
|---|---|
| Listed thickness | 13mm, with the agreed construction schedule |
| Base reference | Prepared bituminous concrete; cement-concrete projects discussed where applicable |
| Wearing finish | Selected EPDM-granule texture and colour |
| Sample | Availability and dispatch arrangements confirmed with the enquiry |
| Friction and other tests | Required methods and acceptance criteria identified for the project |
| Supply contents | Materials, quantities, packing and delivery terms stated in the quotation |
The local team follows the specified base preparation and material application sequence. Check each stage and respect the curing conditions before further work.
Apply the selected wearing finish, complete the layout markings and carry out the agreed acceptance checks before reopening.

USAWEGI can discuss full-PU track materials, the project drawing and installation guidance. Send the dimensions, base photographs and required standard with the enquiry.
Confirm component identification, packing and receiving checks with the order. Installation, local base repairs and testing responsibilities are recorded in the project plan.

Remove debris, maintain water outlets and inspect edges and worn areas. Clean with a method suitable for the finish and arrange repairs when needed.
Yes. Send the base condition and levels for review with the selected preparation instructions.
A rating requires the relevant test result and applicable conditions.
Request the applicable documents for the proposed system and any required venue checks.
Country, track drawing, asphalt-base photographs, intended activities and required acceptance tests.