logo
Products
PRODUCTS DETAILS
Home > Products >
Anti Skid Sandwich System Track with Variable Thicknesses

Anti Skid Sandwich System Track with Variable Thicknesses

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 20000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
SGS, ISO
Model Number
AR-SP-06
Weather Resistance:
Excellent
Surface:
Non-slip, Spray Surface
Thickness:
13mm/15mm
Durability:
High
Structure:
Integrated
Material:
PU Coating, Prefabricated Roll Material, EPDM Granule
Shock Absorption:
High
Installation:
Easy
Sample Lead Time:
1-3 Days
Highlight:

Sandwich System Track

,

Variable Thicknesses Sandwich System Track

,

Anti Skid Sandwich System Track

Product Description

01 / RUNNING TRACK SYSTEM

Texture selected around traction requirements

Compare the surface finish and applicable traction tests for the actual sport and exposure. Cleaning and contamination control remain part of in-service performance.

Surface detail
Surface detail · Construction and configuration vary by selected model.

02 / RUNNING TRACK SYSTEM

A defined sandwich track build-up

Coordinate the resilient base, intermediate treatment and wearing surface. Agree layer materials and application quantities before installation.

Construction reference
Construction reference · Construction and configuration vary by selected model.

03 / RUNNING TRACK SYSTEM

A coordinated athletic surface build-up

Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Material sample
Material sample · Construction and configuration vary by selected model.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number AR-SP-06
Weather Resistance Excellent
Surface Non-slip, Spray Surface
Thickness 13mm/15mm
Durability High
Structure Integrated
Material PU Coating, Prefabricated Roll Material, EPDM Granule
Shock Absorption High
Installation Easy
Packaging Details barrrel
Highlight Sandwich System Track, Variable Thicknesses Sandwich System Track, Anti Skid Sandwich System Track

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Application reference
Application reference · Layout and surface selection vary by venue.
Venue layout reference
Venue layout reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

Products
PRODUCTS DETAILS
Anti Skid Sandwich System Track with Variable Thicknesses
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T,,Paypal,Western Union
Supply Capacity: 20000 sq.m per Month
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
SGS, ISO
Model Number
AR-SP-06
Weather Resistance:
Excellent
Surface:
Non-slip, Spray Surface
Thickness:
13mm/15mm
Durability:
High
Structure:
Integrated
Material:
PU Coating, Prefabricated Roll Material, EPDM Granule
Shock Absorption:
High
Installation:
Easy
Sample Lead Time:
1-3 Days
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
Drums
Delivery Time:
15-30 days, depending on order requirements
Payment Terms:
L/C,T/T,,Paypal,Western Union
Supply Ability:
20000 sq.m per Month
Highlight

Sandwich System Track

,

Variable Thicknesses Sandwich System Track

,

Anti Skid Sandwich System Track

Product Description

01 / RUNNING TRACK SYSTEM

Texture selected around traction requirements

Compare the surface finish and applicable traction tests for the actual sport and exposure. Cleaning and contamination control remain part of in-service performance.

Surface detail
Surface detail · Construction and configuration vary by selected model.

02 / RUNNING TRACK SYSTEM

A defined sandwich track build-up

Coordinate the resilient base, intermediate treatment and wearing surface. Agree layer materials and application quantities before installation.

Construction reference
Construction reference · Construction and configuration vary by selected model.

03 / RUNNING TRACK SYSTEM

A coordinated athletic surface build-up

Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Material sample
Material sample · Construction and configuration vary by selected model.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number AR-SP-06
Weather Resistance Excellent
Surface Non-slip, Spray Surface
Thickness 13mm/15mm
Durability High
Structure Integrated
Material PU Coating, Prefabricated Roll Material, EPDM Granule
Shock Absorption High
Installation Easy
Packaging Details barrrel
Highlight Sandwich System Track, Variable Thicknesses Sandwich System Track, Anti Skid Sandwich System Track

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Application reference
Application reference · Layout and surface selection vary by venue.
Venue layout reference
Venue layout reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.