How are manufacturing origin and installation scope defined?
Confirm the origin of the quoted materials and the installation scope in writing. The site describes US sales and project support backed by manufacturing and supply in Guangdong.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Rubber granules in bags; PU binders and surface coatings in drums. |
| Delivery Period: | 15-30 days for actual products, depending on project size and order requirements. Samples can be arranged promptly. |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 30000 sqm per Month |
01 / RUNNING TRACK SURFACING
A sandwich track is specified as a layered athletic surface. Define the resilient base, intermediate layer and wearing finish together, then customise the build-up to the venue requirements.
02 / RUNNING TRACK SURFACING
The track programme connects substrate preparation, layer application and line marking. A defined installation scope makes the material schedule and the site team’s responsibilities clear.
03 / RUNNING TRACK SURFACING
Coordinate the project location, material origin, shipping and contractor scope in the proposal. U.S. venue requirements guide the supply discussion without changing the agreed construction or local-works responsibilities.
Custom sandwich-system running-track supply for school and stadium projects, with installation scope coordinated around the site. A layered surface brings the resilient base and wearing finish into one construction schedule. Define equipment, materials, local works and acceptance testing clearly for a project-ready proposal.
For project owners requesting a coordinated sandwich-track supply and installation proposal for a specific site.
The physical sample shows surface texture and construction details that a distant venue photograph cannot. Compare the selected finish with the activity and care requirements.
Coordinate lanes, bends, markings and access transitions around the venue layout. Resolve the connection to adjacent surfaces and drainage before the running finish is installed.
Coordinate surface falls, base drainage and outlet positions for the selected track system. Resolve edges and connections before applying the running surface.
Compare the available finish samples with the venue colour plan. Approve the selected material and marking contrast before bulk ordering and staged application.
The installation sequence connects preparation, positioning or material application, finishing and inspection. Follow the selected system instructions and respect the required curing conditions.
Separate the material configuration, packing, transport and local works in the supply proposal. Define the components and responsibilities before comparing complete project quotations.
PRODUCT CONFIGURATION
Listed specifications; confirm the selected construction in the quotation.
| Place of Origin | Guangdong,China |
|---|---|
| Model Number | UWG-SRT-1 |
| System Type | Sandwich System(Professional Competition Grade) |
| Surface Textured | Granular(High Friction & Anti-Slip) |
| Layer Structure | Dual-Layer: SBR Base Mat + EPDM Wear-Resistant Top Layer |
| Material | High-Grade EPDM Granules + Elastic Polyurethane ) +SBR Rubber |
| UV Resistance | Superior (Long-term Color Stability) |
| Durability | High |
| Weather Resistance | All-Weather Performance |
Remove debris, manage surface contamination and keep drainage clear. Inspect high-use areas, edges and markings, and repair damage using the selected system’s compatible method.
Confirm the origin of the quoted materials and the installation scope in writing. The site describes US sales and project support backed by manufacturing and supply in Guangdong.
Provide the area, layout, base type, required construction, colours, site location and acceptance standard. Distinguish materials, base repairs, installation and testing in the scope.
Send the following details for a matched material and supply proposal.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Rubber granules in bags; PU binders and surface coatings in drums. |
| Delivery Period: | 15-30 days for actual products, depending on project size and order requirements. Samples can be arranged promptly. |
| Payment Method: | L/C,T/T,,Paypal,Western Union |
| Supply Capacity: | 30000 sqm per Month |
01 / RUNNING TRACK SURFACING
A sandwich track is specified as a layered athletic surface. Define the resilient base, intermediate layer and wearing finish together, then customise the build-up to the venue requirements.
02 / RUNNING TRACK SURFACING
The track programme connects substrate preparation, layer application and line marking. A defined installation scope makes the material schedule and the site team’s responsibilities clear.
03 / RUNNING TRACK SURFACING
Coordinate the project location, material origin, shipping and contractor scope in the proposal. U.S. venue requirements guide the supply discussion without changing the agreed construction or local-works responsibilities.
Custom sandwich-system running-track supply for school and stadium projects, with installation scope coordinated around the site. A layered surface brings the resilient base and wearing finish into one construction schedule. Define equipment, materials, local works and acceptance testing clearly for a project-ready proposal.
For project owners requesting a coordinated sandwich-track supply and installation proposal for a specific site.
The physical sample shows surface texture and construction details that a distant venue photograph cannot. Compare the selected finish with the activity and care requirements.
Coordinate lanes, bends, markings and access transitions around the venue layout. Resolve the connection to adjacent surfaces and drainage before the running finish is installed.
Coordinate surface falls, base drainage and outlet positions for the selected track system. Resolve edges and connections before applying the running surface.
Compare the available finish samples with the venue colour plan. Approve the selected material and marking contrast before bulk ordering and staged application.
The installation sequence connects preparation, positioning or material application, finishing and inspection. Follow the selected system instructions and respect the required curing conditions.
Separate the material configuration, packing, transport and local works in the supply proposal. Define the components and responsibilities before comparing complete project quotations.
PRODUCT CONFIGURATION
Listed specifications; confirm the selected construction in the quotation.
| Place of Origin | Guangdong,China |
|---|---|
| Model Number | UWG-SRT-1 |
| System Type | Sandwich System(Professional Competition Grade) |
| Surface Textured | Granular(High Friction & Anti-Slip) |
| Layer Structure | Dual-Layer: SBR Base Mat + EPDM Wear-Resistant Top Layer |
| Material | High-Grade EPDM Granules + Elastic Polyurethane ) +SBR Rubber |
| UV Resistance | Superior (Long-term Color Stability) |
| Durability | High |
| Weather Resistance | All-Weather Performance |
Remove debris, manage surface contamination and keep drainage clear. Inspect high-use areas, edges and markings, and repair damage using the selected system’s compatible method.
Confirm the origin of the quoted materials and the installation scope in writing. The site describes US sales and project support backed by manufacturing and supply in Guangdong.
Provide the area, layout, base type, required construction, colours, site location and acceptance standard. Distinguish materials, base repairs, installation and testing in the scope.
Send the following details for a matched material and supply proposal.