logo
Products
PRODUCTS DETAILS
Home > Products >
Full PU Running Track System for Stadium School and Athletic Facility Projects

Full PU Running Track System for Stadium School and Athletic Facility Projects

MOQ: 1000 square meters
Price: Price Upon Request
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
LABOSPORS/WA/ISO 9001/CE/SGS/
Model Number
USWG-FPU-13-1
Material:
PU Binder And EPDM Rubber Granules
Surface Type:
Seamless Non Porous Full PU System
Standard Thickness:
13 Mm To 25 Mm
Force Reduction:
43 Percent
Tensile Strength:
0.8 MPa
Elongation At Break:
90 Percent
Wet Skid Resistance:
56 BPN
Performance Level:
High Performance Full PU System
Recommended Application:
Stadium School University And Training Facility
Sample Lead Time:
1-3 Days
Highlight:

PU running track for stadiums

,

polyurethane running track for schools

,

athletic facility PU track system

Product Description

01 / RUNNING TRACK SYSTEM

Full polyurethane track construction

Compare the selected polyurethane build-up, elastic response and wear surface as one system. Match the agreed depth and finish to the venue specification.

Construction reference
Construction reference · Construction and configuration vary by selected model.

02 / RUNNING TRACK SYSTEM

A surface layout for the school timetable

Coordinate physical education, daily training and sports-day use with the surface layout. Plan markings, circulation and the installation window around the campus operating schedule.

Application reference
Application reference · Layout and surface selection vary by venue.

03 / RUNNING TRACK SYSTEM

A coordinated athletic surface build-up

Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Material sample
Material sample · Construction and configuration vary by selected model.
Surface detail
Surface detail · Construction and configuration vary by selected model.
Colour and finish options
Colour and finish options · Confirm the selected configuration in the project specification.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number USWG-FPU-13-1
Material PU Binder And EPDM Rubber Granules
Surface Type Seamless Non Porous Full PU System
Force Reduction 43 Percent
Tensile Strength 0.8 MPa
Elongation At Break 90 Percent
Wet Skid Resistance 56 BPN
Performance Level High Performance Full PU System
Recommended Application Stadium School University And Training Facility
Packaging Details Steel Drums
Highlight PU running track for stadiums, polyurethane running track for schools, athletic facility PU track system

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Venue layout reference
Venue layout reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

Installation reference
Installation reference · Confirm the selected configuration in the project specification.

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

Products
PRODUCTS DETAILS
Full PU Running Track System for Stadium School and Athletic Facility Projects
MOQ: 1000 square meters
Price: Price Upon Request
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
LABOSPORS/WA/ISO 9001/CE/SGS/
Model Number
USWG-FPU-13-1
Material:
PU Binder And EPDM Rubber Granules
Surface Type:
Seamless Non Porous Full PU System
Standard Thickness:
13 Mm To 25 Mm
Force Reduction:
43 Percent
Tensile Strength:
0.8 MPa
Elongation At Break:
90 Percent
Wet Skid Resistance:
56 BPN
Performance Level:
High Performance Full PU System
Recommended Application:
Stadium School University And Training Facility
Sample Lead Time:
1-3 Days
Minimum Order Quantity:
1000 square meters
Price:
Price Upon Request
Packaging Details:
Drums
Delivery Time:
15-30 days, depending on order requirements
Payment Terms:
L/C,T/T
Supply Ability:
10000 Square Meter Per Week
Highlight

PU running track for stadiums

,

polyurethane running track for schools

,

athletic facility PU track system

Product Description

01 / RUNNING TRACK SYSTEM

Full polyurethane track construction

Compare the selected polyurethane build-up, elastic response and wear surface as one system. Match the agreed depth and finish to the venue specification.

Construction reference
Construction reference · Construction and configuration vary by selected model.

02 / RUNNING TRACK SYSTEM

A surface layout for the school timetable

Coordinate physical education, daily training and sports-day use with the surface layout. Plan markings, circulation and the installation window around the campus operating schedule.

Application reference
Application reference · Layout and surface selection vary by venue.

03 / RUNNING TRACK SYSTEM

A coordinated athletic surface build-up

Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

MATERIAL & CONSTRUCTION

Specify the layers that form the finished track

The selected surface must be understood as a layer build-up. The resilient construction, wearing finish, bonding or site-applied materials and line marking are coordinated with the intended use and supporting base.

A material sample helps explain the finish and construction, while the installation specification identifies actual layer materials, thickness and preparation. Keep different running-track systems separate when comparing quotations.

Material sample
Material sample · Construction and configuration vary by selected model.
Surface detail
Surface detail · Construction and configuration vary by selected model.
Colour and finish options
Colour and finish options · Confirm the selected configuration in the project specification.

PRODUCT CONFIGURATION

Model information

Information listed on the original product page. Confirm the selected model and technical data before ordering.

Brand Name USAWEGI
Model Number USWG-FPU-13-1
Material PU Binder And EPDM Rubber Granules
Surface Type Seamless Non Porous Full PU System
Force Reduction 43 Percent
Tensile Strength 0.8 MPa
Elongation At Break 90 Percent
Wet Skid Resistance 56 BPN
Performance Level High Performance Full PU System
Recommended Application Stadium School University And Training Facility
Packaging Details Steel Drums
Highlight PU running track for stadiums, polyurethane running track for schools, athletic facility PU track system

VENUE PLANNING

Fit the specification to the place of use

School, stadium, club and training-facility track projects. Specify the complete surface build-up around the venue’s use, substrate and exposure. Layer construction, texture, thickness, markings and required acceptance tests belong in one coordinated scope.

Venue layout reference
Venue layout reference · Layout and surface selection vary by venue.

INSTALLATION

Coordinate the material with the site works

01

Survey base strength, levels, moisture and drainage

02

Approve the layer build-up, sample and colour schedule

03

Apply or lay the selected system under suitable conditions

04

Inspect markings, interfaces and the agreed acceptance tests

Installation reference
Installation reference · Confirm the selected configuration in the project specification.

SUPPLY & HANDOVER

Define what arrives and what is completed on site

List track layout and area; base condition; layer construction; selected thickness and colours; intended use; installation and testing scope. The order should identify the model, quantities, packing and destination alongside the local installation responsibilities.

Keep the approved sample and component schedule with the order record. At handover, record the supplied construction, installation checks and maintenance instructions for the venue team.

Keep the surface ready for regular use

Remove debris and contamination, keep drainage clear and inspect edges, markings and high-use areas. Repair damage with the compatible method for the selected system.

Record inspections and repairs, and keep replacement materials compatible with the supplied construction. Adjust the care routine to the actual intensity of use and site conditions.

BUYER QUESTIONS

Questions before the specification is agreed

What information makes quotations comparable?

Ask each supplier to identify the same base repairs, layer construction, material quantities, installation responsibilities, tests and handover documents.

Can the specification be customised?

Start with the site drawing and intended use. Review the available model, colour and configuration choices with the supplier, then identify the selected options in the quotation.

How should samples and documents be compared?

Check that the sample, technical data and quotation refer to the same proposed model. Where testing or certification is required, identify the applicable product or installed-facility scope rather than relying on a general company certificate.

Order and delivery planning

Standard order lead time: 15-30 days, depending on order requirements.

Sample lead time: 1-3 days.

Minimum order quantity and the selected packing are shown in the trading information for this product.

YOUR PROJECT

Request a configuration and a defined supply scope

Send your location, area or layout and the following information:

  • Track layout and area
  • base condition
  • layer construction
  • selected thickness and colours
  • intended use
  • installation and testing scope

Send your requirements using the enquiry form on this product page.

USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.