| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Protective containers for the selected material package |
| Delivery Period: | Confirmed in the quotation for the order |
Club athletics facilities need a running surface selected for training, footwear and the way the venue is maintained. The AR-SP-01 sandwich range uses a layered construction in which the elastic support, sealing stage and wearing finish are coordinated.
This proposal focuses on the materials beneath the visible finish as well as the top texture. A clear layer schedule gives the contractor and club a common reference when comparing supply offers.

The supporting rubber construction provides the elastic body. The specified seal separates construction stages, and the wearing finish provides the exposed running face. The proposed combination matters more than naming one binder or granule in isolation.
Agree the actual layer thicknesses and component references for the project. The term sandwich is used differently in different markets, so a section drawing and material schedule are more useful than the label alone.

A running oval, warm-up route and field-event approach may have different use and acceptance requirements. Identify the intended footwear and activities before agreeing the proposed construction.
Where shock absorption, deformation or traction results are required, review evidence for that system and any installed-venue checks. A general statement of elasticity cannot replace the specified performance assessment.

The supporting asphalt or concrete, where specified, must suit the selected materials and project design. Review levels, cracks, moisture and water routes before applying the running construction.
Observe the product instructions for mixing, application quantities and the interval between stages. An unfinished or contaminated interface can affect the layers above it even when the final colour looks acceptable.
Retain the approved section, component labels, colour reference and installation records. This makes later repair enquiries more precise than simply asking for red track material.
Remove debris, keep drains clear and inspect heavily used areas and edges. The planning reference for running-track service life is 10 years, with actual performance dependent on conditions and care; contractual warranty coverage is agreed separately.

| Brand | USAWEGI |
|---|---|
| Model reference | AR-SP-01 |
| Installation | Site-applied selected layered system |
| Service-life planning reference | 10 years; warranty terms agreed separately |
Can an old elastic layer be retained? Its condition and compatibility with the proposed layers must be assessed; do not assume all existing rubber bases are reusable.
Send the track drawing, training activities, base photographs, location and required acceptance documents. USAWEGI can discuss the AR-SP-01 construction, material quantities, packing and installation-support arrangement for the club project.
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Protective containers for the selected material package |
| Delivery Period: | Confirmed in the quotation for the order |
Club athletics facilities need a running surface selected for training, footwear and the way the venue is maintained. The AR-SP-01 sandwich range uses a layered construction in which the elastic support, sealing stage and wearing finish are coordinated.
This proposal focuses on the materials beneath the visible finish as well as the top texture. A clear layer schedule gives the contractor and club a common reference when comparing supply offers.

The supporting rubber construction provides the elastic body. The specified seal separates construction stages, and the wearing finish provides the exposed running face. The proposed combination matters more than naming one binder or granule in isolation.
Agree the actual layer thicknesses and component references for the project. The term sandwich is used differently in different markets, so a section drawing and material schedule are more useful than the label alone.

A running oval, warm-up route and field-event approach may have different use and acceptance requirements. Identify the intended footwear and activities before agreeing the proposed construction.
Where shock absorption, deformation or traction results are required, review evidence for that system and any installed-venue checks. A general statement of elasticity cannot replace the specified performance assessment.

The supporting asphalt or concrete, where specified, must suit the selected materials and project design. Review levels, cracks, moisture and water routes before applying the running construction.
Observe the product instructions for mixing, application quantities and the interval between stages. An unfinished or contaminated interface can affect the layers above it even when the final colour looks acceptable.
Retain the approved section, component labels, colour reference and installation records. This makes later repair enquiries more precise than simply asking for red track material.
Remove debris, keep drains clear and inspect heavily used areas and edges. The planning reference for running-track service life is 10 years, with actual performance dependent on conditions and care; contractual warranty coverage is agreed separately.

| Brand | USAWEGI |
|---|---|
| Model reference | AR-SP-01 |
| Installation | Site-applied selected layered system |
| Service-life planning reference | 10 years; warranty terms agreed separately |
Can an old elastic layer be retained? Its condition and compatibility with the proposed layers must be assessed; do not assume all existing rubber bases are reusable.
Send the track drawing, training activities, base photographs, location and required acceptance documents. USAWEGI can discuss the AR-SP-01 construction, material quantities, packing and installation-support arrangement for the club project.