MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
IAAF Athletics Track Polyurethane (PU) Track For National Greenway Playground
Performance: It's designed to provide excellent performance for athletes. The polyurethane material provides good energy return, which can help athletes run faster and jump higher. The textured surface of the track also provides good traction, which can help prevent slips and falls.
Durability:Highly durable material that can withstand heavy use over time. Full PU running tracks are designed to last for many years with minimal maintenance, making them a cost-effective option for organizations that want to provide a high-quality running surface.
Versatility: Can be used for a variety of running events, including sprints, hurdles, middle distance, and long distance races. They can also be used for other athletic events, such as long jump and triple jump.
Environmental Impact: Have a relatively low environmental impact compared to other types of running track surfaces. PU is a recyclable material, and some manufacturers even offer recycled PU materials for use in running tracks.
Maintenance: Require relatively little maintenance compared to other types of running track surfaces. They should be cleaned regularly to remove dirt and debris, and any damage should be repaired promptly to prevent further damage.
Product Name
|
Full Pu Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.
MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
IAAF Athletics Track Polyurethane (PU) Track For National Greenway Playground
Performance: It's designed to provide excellent performance for athletes. The polyurethane material provides good energy return, which can help athletes run faster and jump higher. The textured surface of the track also provides good traction, which can help prevent slips and falls.
Durability:Highly durable material that can withstand heavy use over time. Full PU running tracks are designed to last for many years with minimal maintenance, making them a cost-effective option for organizations that want to provide a high-quality running surface.
Versatility: Can be used for a variety of running events, including sprints, hurdles, middle distance, and long distance races. They can also be used for other athletic events, such as long jump and triple jump.
Environmental Impact: Have a relatively low environmental impact compared to other types of running track surfaces. PU is a recyclable material, and some manufacturers even offer recycled PU materials for use in running tracks.
Maintenance: Require relatively little maintenance compared to other types of running track surfaces. They should be cleaned regularly to remove dirt and debris, and any damage should be repaired promptly to prevent further damage.
Product Name
|
Full Pu Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.