MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
IAAF Athletics Track High Quality Full Pu Running Track For School And Competition
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
How long does a full PU running track typically last?
The lifespan of a full PU running track can vary depending on a variety of factors, including the quality of the materials used, the level of maintenance it receives, and the frequency and intensity of use.
Generally speaking, a well-maintained full PU running track can last anywhere from 8 to 12 years or more. However, it's important to note that the track may require some repairs or resurfacing during this time to ensure that it continues to perform at its best.
Regular maintenance is key to extending the lifespan of a full PU running track. This may include cleaning the surface regularly, repairing any damage or cracks, and applying a protective coating to prevent UV damage and other forms of wear and tear.
It's also important to note that the warranty offered by the manufacturer can be an indicator of the expected lifespan of the track. Some manufacturers offer warranties of up to 12 years or more, which can provide some assurance that the track is built to last.
Product features:
(1) Excellent anti-aging, ozone resistance, UV resistance and other properties;
(2) High compactness, strong tensile resistance, good buffering performance;
(3) high glue content, good overall performance;
(4) Suitable for concrete and asphalt foundation.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.
MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
IAAF Athletics Track High Quality Full Pu Running Track For School And Competition
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
How long does a full PU running track typically last?
The lifespan of a full PU running track can vary depending on a variety of factors, including the quality of the materials used, the level of maintenance it receives, and the frequency and intensity of use.
Generally speaking, a well-maintained full PU running track can last anywhere from 8 to 12 years or more. However, it's important to note that the track may require some repairs or resurfacing during this time to ensure that it continues to perform at its best.
Regular maintenance is key to extending the lifespan of a full PU running track. This may include cleaning the surface regularly, repairing any damage or cracks, and applying a protective coating to prevent UV damage and other forms of wear and tear.
It's also important to note that the warranty offered by the manufacturer can be an indicator of the expected lifespan of the track. Some manufacturers offer warranties of up to 12 years or more, which can provide some assurance that the track is built to last.
Product features:
(1) Excellent anti-aging, ozone resistance, UV resistance and other properties;
(2) High compactness, strong tensile resistance, good buffering performance;
(3) high glue content, good overall performance;
(4) Suitable for concrete and asphalt foundation.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.