MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Several factors can affect the lifespan of a full PU running track:
Quality of materials: The quality of the materials used in the construction of the track can affect its durability and performance. Higher quality materials will generally last longer and require less maintenance than lower quality materials.
Level of maintenance: Regular maintenance is crucial to extending the lifespan of a full PU running track. Neglecting maintenance can lead to damage and wear and tear that can shorten the lifespan of the track.
Frequency and intensity of use: The more frequently and intensely a track is used, the more wear and tear it will experience, which can shorten its lifespan.
Climate and weather conditions: Exposure to extreme heat, cold, rain, and other weather conditions can cause damage and wear and tear to a full PU running track over time.
Installation and construction quality: The quality of the installation and construction can affect the lifespan of a track. Poor installation or construction can lead to premature wear and tear and damage to the track.
Product features:
(1) Excellent anti-aging, ozone resistance, UV resistance and other properties;
(2) High compactness, strong tensile resistance, good buffering performance;
(3) high glue content, good overall performance;
(4) Suitable for concrete and asphalt foundation.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.
MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Several factors can affect the lifespan of a full PU running track:
Quality of materials: The quality of the materials used in the construction of the track can affect its durability and performance. Higher quality materials will generally last longer and require less maintenance than lower quality materials.
Level of maintenance: Regular maintenance is crucial to extending the lifespan of a full PU running track. Neglecting maintenance can lead to damage and wear and tear that can shorten the lifespan of the track.
Frequency and intensity of use: The more frequently and intensely a track is used, the more wear and tear it will experience, which can shorten its lifespan.
Climate and weather conditions: Exposure to extreme heat, cold, rain, and other weather conditions can cause damage and wear and tear to a full PU running track over time.
Installation and construction quality: The quality of the installation and construction can affect the lifespan of a track. Poor installation or construction can lead to premature wear and tear and damage to the track.
Product features:
(1) Excellent anti-aging, ozone resistance, UV resistance and other properties;
(2) High compactness, strong tensile resistance, good buffering performance;
(3) high glue content, good overall performance;
(4) Suitable for concrete and asphalt foundation.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.