MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Some additional data points related to full PU running tracks:
Environmental impact: Some full PU running tracks are designed with eco-friendly materials and construction methods, which can reduce their environmental impact and contribute to sustainable practices in the sports industry.
Installation time: The installation time for a full PU running track can vary depending on factors such as the size and complexity of the project. A typical installation can take anywhere from 2 to 4 weeks.
Manufacturer warranty: Full PU running tracks are typically sold with a manufacturer warranty that covers defects in materials and workmanship. The length of the warranty can vary depending on the manufacturer, but is typically between 5 and 10 years.
UV resistance: Full PU running tracks are designed to be resistant to UV radiation, which can cause damage and wear and tear to the track over time. Some tracks include a protective coating to enhance their UV resistance.
Surface temperature: The surface temperature of a full PU running track can vary depending on factors such as the color of the surface and the ambient temperature. Generally, the surface temperature will be cooler than that of other track surfaces such as asphalt or concrete.
Drainage: Full PU running tracks are designed with a drainage system to prevent water from pooling on the surface. The drainage system can include channels or perforations in the track surface, as well as a base layer that is sloped to allow water to flow away from the track.
Track maintenance equipment: Maintaining a full PU running track requires specialized equipment such as a vacuum sweeper, pressure washer, and crack repair tools. Proper maintenance can help extend the lifespan of the track and ensure its performance and safety for athletes.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.
MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Some additional data points related to full PU running tracks:
Environmental impact: Some full PU running tracks are designed with eco-friendly materials and construction methods, which can reduce their environmental impact and contribute to sustainable practices in the sports industry.
Installation time: The installation time for a full PU running track can vary depending on factors such as the size and complexity of the project. A typical installation can take anywhere from 2 to 4 weeks.
Manufacturer warranty: Full PU running tracks are typically sold with a manufacturer warranty that covers defects in materials and workmanship. The length of the warranty can vary depending on the manufacturer, but is typically between 5 and 10 years.
UV resistance: Full PU running tracks are designed to be resistant to UV radiation, which can cause damage and wear and tear to the track over time. Some tracks include a protective coating to enhance their UV resistance.
Surface temperature: The surface temperature of a full PU running track can vary depending on factors such as the color of the surface and the ambient temperature. Generally, the surface temperature will be cooler than that of other track surfaces such as asphalt or concrete.
Drainage: Full PU running tracks are designed with a drainage system to prevent water from pooling on the surface. The drainage system can include channels or perforations in the track surface, as well as a base layer that is sloped to allow water to flow away from the track.
Track maintenance equipment: Maintaining a full PU running track requires specialized equipment such as a vacuum sweeper, pressure washer, and crack repair tools. Proper maintenance can help extend the lifespan of the track and ensure its performance and safety for athletes.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.