MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Choosing the right full PU running track for your needs will depend on several factors:
Intended use: Consider the intended use of the track, such as competitive athletics, physical education classes, or recreational use. This will help determine the required surface thickness, shock absorption, and other performance factors.
Location: The location of the track can also impact the selection of a full PU running track. Consider factors such as climate, weather, and exposure to sunlight when selecting a track.
Budget: Full PU running tracks can vary widely in price, so it's important to consider your budget when selecting a track. Keep in mind that higher quality tracks may require a larger initial investment but can provide better performance and a longer lifespan.
Manufacturer and certifications: Look for full PU running tracks that are manufactured by reputable companies and have certifications from organizations such as the International Association of Athletics Federations (IAAF).
Maintenance requirements: Consider the maintenance requirements of the track, such as cleaning, repairs, and resurfacing. Choose a track that is appropriate for the level of maintenance that you can provide.
Environmental impact: Consider the environmental impact of the track, and look for eco-friendly options that use sustainable materials and construction methods.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.
MOQ: | 1000 Square Meters |
Price: | USD 15 Square Meter |
Standard Packaging: | Barrel / Pallet / Bag |
Delivery Period: | 7 work days |
Payment Method: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Capacity: | 10000 Square Meter Per Week |
Product Name
|
Full Pur Athletic Track
|
|||
Material
|
EPDM granules + PU Binder
|
|||
Color
|
Customized, Red, Blue
|
|||
Thickness:
|
9-15mm (recommend 13mm) or customized
|
|||
Application
|
School, communities, stadium, training center
|
|||
Special Conquest
|
Non-poisonous, harmless and odorless
|
|||
Foundation/Base
|
Cement or asphalt
|
|||
Free Sample
|
Available
|
|||
Packaging Details
|
Liquid systems by using 25-300kg per steel barrel with wooden pallet reinforcement.
|
|||
Delivery Detail
|
shipped in ten days after paid
|
Choosing the right full PU running track for your needs will depend on several factors:
Intended use: Consider the intended use of the track, such as competitive athletics, physical education classes, or recreational use. This will help determine the required surface thickness, shock absorption, and other performance factors.
Location: The location of the track can also impact the selection of a full PU running track. Consider factors such as climate, weather, and exposure to sunlight when selecting a track.
Budget: Full PU running tracks can vary widely in price, so it's important to consider your budget when selecting a track. Keep in mind that higher quality tracks may require a larger initial investment but can provide better performance and a longer lifespan.
Manufacturer and certifications: Look for full PU running tracks that are manufactured by reputable companies and have certifications from organizations such as the International Association of Athletics Federations (IAAF).
Maintenance requirements: Consider the maintenance requirements of the track, such as cleaning, repairs, and resurfacing. Choose a track that is appropriate for the level of maintenance that you can provide.
Environmental impact: Consider the environmental impact of the track, and look for eco-friendly options that use sustainable materials and construction methods.
Quality requirements for runway foundation
Plastic runway construction is based on asphalt or cement, and the basic practice is roughly the same as road construction. The foundation surface requires good flatness, so as to ensure the consistency of the thickness of the plastic surface layer. The quality requirements for the plastic runway foundation are as follows.
(1) Slope: transverse < 1% (curve 8%, straight 5%, semi-circle 5%), longitudinal < 1%, jump area less than 0.4%, the surface should be smooth, smooth drainage.
(2) flatness: flatness qualified rate of more than 95%, 3 meters straightedge measurement error is not more than 3㎜
(3) Positioning: In order to accurately construct and draw lines, the four semi-circular tangents and two circular centers of the runway site should be firmly and distinctly marked.
(4) Drainage: The drainage system must remove water two hours after a heavy rain. In frozen areas, it is better to add a buffer layer of geotextile between asphalt layer and gravel layer. Special waterproofing should be done along the foundation of the drain trench.
(5) Strength and stability: the foundation should have a certain strength and stability, the surface is uniform and solid, smooth without cracks, no rotten edge pile squeezing, no pockmarked surface, smooth joints without obvious height difference. The cushion is compacted with a density of more than 95%. After being pressed by a medium roller, there are no significant tire marks and loose float soil.