logo
Products
PRODUCTS DETAILS
Home > Products >
Full PU Synthetic Athletic Track System 13mm 15mm 20mm Durable High Friction And More

Full PU Synthetic Athletic Track System 13mm 15mm 20mm Durable High Friction And More

MOQ: 1000 square meters
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Surface:
All-Weather
Service Life:
Eight-twelve Years
Shock Absorption:
Resilient Surface
Durability:
High
Base Requirement:
Cement Concrete Or Bituminous Concrete
Sample:
Free Sample
Friction:
High
Thickness:
13mm
Sample Lead Time:
1-3 Days
Highlight:

15mm Athletic Track System

,

20mm Athletic Track System

,

Full PU Synthetic Athletic Track System

Product Description

Choose the full-PU track as a complete build

Bring the supporting PU construction and the wearing face into one athletics-surface proposal. Compare the 13 mm, 15 mm and 20 mm options through their specified layer construction and material quantities.

For a school, club or training venue, the selected build is matched to the intended activities and project requirements before material quantities are calculated.

Marked red athletics lanes at a running venue

Thickness belongs with the layers that create it

The proposed system identifies its supporting layers and upper finish. A thicker option changes the material schedule; it is not simply a different number applied to the same quotation.

A section sample helps the buyer see the material roles. The order states the actual total thickness, selected components and quantities for that option.

Illustrative layer arrangement of a full-PU running system
Illustrative

See the wearing texture that runners meet

The top finish provides the visible contact surface. Its texture is chosen with the activities, shoes and the project’s friction requirement.

Where a measured grip result is specified, the corresponding method, conditions and offered construction are reviewed together. Appearance alone cannot establish the required friction value.

Textured top face and edge of a full-PU surface sample

From prepared base to finished lanes

Base repairs and levels come before the selected PU construction is applied. The material stages follow their mixing, placement and curing instructions.

The installation sequence finishes with the agreed wearing face and markings. Interfaces with paths, field edges and drainage are inspected alongside the running surface.

Illustrative sequence for applying a full-PU track
Illustrative

A clear material schedule supports a maintained track

USAWEGI can discuss the thickness option, component quantities, colours and installation guidance. Packing and delivery terms are agreed for the destination.

Keep the selected surface reference at the venue. Regular removal of abrasive debris, inspection of busy zones and compatible local repair support continued use of the chosen finish.

Compare the options on the same project brief

Is the thickest option automatically best? Selection also considers the actual layer construction, intended use, prepared base and required system tests.

Send the track layout, country, base photographs and required tests. Specify which of the 13 mm, 15 mm and 20 mm options you want to compare in the full-PU proposal.

Get an Outdoor Sports-Surface Proposal
Products
PRODUCTS DETAILS
Full PU Synthetic Athletic Track System 13mm 15mm 20mm Durable High Friction And More
MOQ: 1000 square meters
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Surface:
All-Weather
Service Life:
Eight-twelve Years
Shock Absorption:
Resilient Surface
Durability:
High
Base Requirement:
Cement Concrete Or Bituminous Concrete
Sample:
Free Sample
Friction:
High
Thickness:
13mm
Sample Lead Time:
1-3 Days
Minimum Order Quantity:
1000 square meters
Packaging Details:
Drums
Delivery Time:
15-30 days, depending on order requirements
Highlight

15mm Athletic Track System

,

20mm Athletic Track System

,

Full PU Synthetic Athletic Track System

Product Description

Choose the full-PU track as a complete build

Bring the supporting PU construction and the wearing face into one athletics-surface proposal. Compare the 13 mm, 15 mm and 20 mm options through their specified layer construction and material quantities.

For a school, club or training venue, the selected build is matched to the intended activities and project requirements before material quantities are calculated.

Marked red athletics lanes at a running venue

Thickness belongs with the layers that create it

The proposed system identifies its supporting layers and upper finish. A thicker option changes the material schedule; it is not simply a different number applied to the same quotation.

A section sample helps the buyer see the material roles. The order states the actual total thickness, selected components and quantities for that option.

Illustrative layer arrangement of a full-PU running system
Illustrative

See the wearing texture that runners meet

The top finish provides the visible contact surface. Its texture is chosen with the activities, shoes and the project’s friction requirement.

Where a measured grip result is specified, the corresponding method, conditions and offered construction are reviewed together. Appearance alone cannot establish the required friction value.

Textured top face and edge of a full-PU surface sample

From prepared base to finished lanes

Base repairs and levels come before the selected PU construction is applied. The material stages follow their mixing, placement and curing instructions.

The installation sequence finishes with the agreed wearing face and markings. Interfaces with paths, field edges and drainage are inspected alongside the running surface.

Illustrative sequence for applying a full-PU track
Illustrative

A clear material schedule supports a maintained track

USAWEGI can discuss the thickness option, component quantities, colours and installation guidance. Packing and delivery terms are agreed for the destination.

Keep the selected surface reference at the venue. Regular removal of abrasive debris, inspection of busy zones and compatible local repair support continued use of the chosen finish.

Compare the options on the same project brief

Is the thickest option automatically best? Selection also considers the actual layer construction, intended use, prepared base and required system tests.

Send the track layout, country, base photographs and required tests. Specify which of the 13 mm, 15 mm and 20 mm options you want to compare in the full-PU proposal.

Get an Outdoor Sports-Surface Proposal
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.