logo
Products
PRODUCTS DETAILS
Home > Products >
Professional 13mm Hybrid Plastic Running Track Eco-Friendly PU and EPDM Granules Wear-Resistant Anti-Aging IAAF-Compliant for Schools

Professional 13mm Hybrid Plastic Running Track Eco-Friendly PU and EPDM Granules Wear-Resistant Anti-Aging IAAF-Compliant for Schools

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,L/C,Paypal
Supply Capacity: 40000 sq.m per Month
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
Hybrid
Weather Resistance:
Excellent
Shock Absorption:
Excellent
Slip Resistance:
Excellent
UV Resistance:
Excellent
Durability:
Excellent
Surface Color:
Customized
Color:
Many Colors Can Be Chosen, Welcome To Customize
Thickness:
10mm,15mm,20mm Or Customized
Highlight:

13mm Hybrid Plastic Running Track

,

Eco-Friendly Hybrid Plastic Running Track

,

Wear-Resistant Hybrid Plastic Running Track

Product Description
Professional 13mm hybrid track

Give school running
a dedicated training surface.

A PU-and-EPDM hybrid construction for schools developing their running lanes and athletics programme.

Completed blue university running track with clearly marked lanes in Jieyang

The 13mm option brings a textured finish and elastic construction into one running-track proposal. Clearly marked lanes give lessons, practice sessions and sports events a defined space.

Start with the running activities and required specification, then select the track construction and finish together.

Request a 13mm Hybrid Track Proposal
A wearing surface for regular use

Choose the finish
your runners actually contact.

The top of the track is a textured wearing layer. Its material and finish are selected alongside the intended footwear, use frequency and required performance checks.

Review a physical sample to compare the texture and colour. Wear and weathering requirements can then be stated for the offered material instead of relying on appearance alone.

Red granular hybrid-track sample with the wearing finish and supporting construction
The hybrid structure

PU and granules.
One coordinated elastic construction.

The original system graphic shows rubber granules and a polyurethane reinforcement layer working within a layered running surface. The supporting construction and wearing finish are specified together.

This page focuses on the nominal 13mm option. Confirm the selected build-up and application quantities with the project material schedule.

Original PU and granule hybrid running-track layer arrangement
School procurement

Give your team
clear material information.

School buyers can request the proposed component list, technical data, handling guidance and relevant test records with the quotation.

Specify local substance limits and the required athletics tests for your project. Any certification claim must match the exact offered system and its applicable documents; the installed venue may need separate checks.

Specification

Define what will be supplied.

Brand / model USAWEGI / Hybrid
Selected nominal thickness 13mm, with the agreed project build-up
Material category PU and EPDM-granule hybrid track construction
Use brief School running, athletics practice and planned sports activities
Finish and colours Selected with the material sample and layout
Testing Required methods and acceptance criteria stated for the project
Supply contents Components, quantities, packing and delivery terms listed in the quotation
Base preparation

Build the finished track
on a prepared foundation.

Surfacing starts with the condition beneath it. Check levels, repairs, cleanliness and water routes before the elastic construction is applied.

For a new venue, coordinate these works with the local contractor. For a replacement, photographs of worn areas and exposed base conditions help explain what preparation is required.

Prepared dark running-track base beside a university field before the coloured finish
Installation and marking

Follow the layer schedule.
Finish the lanes with care.

The installer follows the selected material instructions for preparation, mixing, placement and curing. Each stage is checked before the next begins.

The final layout includes lanes and functional markings from the track drawing. Confirm the opening conditions and any required site testing before the venue returns to use.

Hybrid-track layer application, surface finishing and lane-marking photographs
Delivery and supplier support

Keep the material plan
with the delivered order.

USAWEGI can discuss sports-surface supply, drawings and installation guidance. Material identification, packing and receiving checks help connect the shipment to the selected system.

Share the school location, track dimensions, intended use, project stage and construction period. The quotation can then identify the requested materials and local-work responsibilities.

Track-material drums arranged in a shipping container
Project communication

Keep the decisions
easy for your team to follow.

Use one agreed drawing, component list and sample reference when communicating with the supplier and installer. Include the inspection and acceptance requirements with the order.

This keeps discussions focused on the actual school track and the materials proposed for it.

Supplier project and customer meetings
Care and common questions

Support the track
through regular upkeep.

Keep the lanes free of debris, clear water outlets and inspect the surface and edges. Follow the cleaning and care guidance for the supplied finish.

Can the track colour be selected?

Yes. Discuss the available material colours and lane layout with the sample and drawing.

Is a fixed installation time included?

The programme depends on the venue, base preparation, weather and specified construction.

What documents should a school request?

The proposed system data, applicable material tests, handling instructions and any project-specific athletics documentation.

What is needed for a proposal?

Country, track plan, base photographs, use requirements and the required testing and delivery arrangements.

Discuss Your School Athletics Track
Products
PRODUCTS DETAILS
Professional 13mm Hybrid Plastic Running Track Eco-Friendly PU and EPDM Granules Wear-Resistant Anti-Aging IAAF-Compliant for Schools
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,L/C,Paypal
Supply Capacity: 40000 sq.m per Month
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
Hybrid
Weather Resistance:
Excellent
Shock Absorption:
Excellent
Slip Resistance:
Excellent
UV Resistance:
Excellent
Durability:
Excellent
Surface Color:
Customized
Color:
Many Colors Can Be Chosen, Welcome To Customize
Thickness:
10mm,15mm,20mm Or Customized
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
T/T,L/C,Paypal
Supply Ability:
40000 sq.m per Month
Highlight

13mm Hybrid Plastic Running Track

,

Eco-Friendly Hybrid Plastic Running Track

,

Wear-Resistant Hybrid Plastic Running Track

Product Description
Professional 13mm hybrid track

Give school running
a dedicated training surface.

A PU-and-EPDM hybrid construction for schools developing their running lanes and athletics programme.

Completed blue university running track with clearly marked lanes in Jieyang

The 13mm option brings a textured finish and elastic construction into one running-track proposal. Clearly marked lanes give lessons, practice sessions and sports events a defined space.

Start with the running activities and required specification, then select the track construction and finish together.

Request a 13mm Hybrid Track Proposal
A wearing surface for regular use

Choose the finish
your runners actually contact.

The top of the track is a textured wearing layer. Its material and finish are selected alongside the intended footwear, use frequency and required performance checks.

Review a physical sample to compare the texture and colour. Wear and weathering requirements can then be stated for the offered material instead of relying on appearance alone.

Red granular hybrid-track sample with the wearing finish and supporting construction
The hybrid structure

PU and granules.
One coordinated elastic construction.

The original system graphic shows rubber granules and a polyurethane reinforcement layer working within a layered running surface. The supporting construction and wearing finish are specified together.

This page focuses on the nominal 13mm option. Confirm the selected build-up and application quantities with the project material schedule.

Original PU and granule hybrid running-track layer arrangement
School procurement

Give your team
clear material information.

School buyers can request the proposed component list, technical data, handling guidance and relevant test records with the quotation.

Specify local substance limits and the required athletics tests for your project. Any certification claim must match the exact offered system and its applicable documents; the installed venue may need separate checks.

Specification

Define what will be supplied.

Brand / model USAWEGI / Hybrid
Selected nominal thickness 13mm, with the agreed project build-up
Material category PU and EPDM-granule hybrid track construction
Use brief School running, athletics practice and planned sports activities
Finish and colours Selected with the material sample and layout
Testing Required methods and acceptance criteria stated for the project
Supply contents Components, quantities, packing and delivery terms listed in the quotation
Base preparation

Build the finished track
on a prepared foundation.

Surfacing starts with the condition beneath it. Check levels, repairs, cleanliness and water routes before the elastic construction is applied.

For a new venue, coordinate these works with the local contractor. For a replacement, photographs of worn areas and exposed base conditions help explain what preparation is required.

Prepared dark running-track base beside a university field before the coloured finish
Installation and marking

Follow the layer schedule.
Finish the lanes with care.

The installer follows the selected material instructions for preparation, mixing, placement and curing. Each stage is checked before the next begins.

The final layout includes lanes and functional markings from the track drawing. Confirm the opening conditions and any required site testing before the venue returns to use.

Hybrid-track layer application, surface finishing and lane-marking photographs
Delivery and supplier support

Keep the material plan
with the delivered order.

USAWEGI can discuss sports-surface supply, drawings and installation guidance. Material identification, packing and receiving checks help connect the shipment to the selected system.

Share the school location, track dimensions, intended use, project stage and construction period. The quotation can then identify the requested materials and local-work responsibilities.

Track-material drums arranged in a shipping container
Project communication

Keep the decisions
easy for your team to follow.

Use one agreed drawing, component list and sample reference when communicating with the supplier and installer. Include the inspection and acceptance requirements with the order.

This keeps discussions focused on the actual school track and the materials proposed for it.

Supplier project and customer meetings
Care and common questions

Support the track
through regular upkeep.

Keep the lanes free of debris, clear water outlets and inspect the surface and edges. Follow the cleaning and care guidance for the supplied finish.

Can the track colour be selected?

Yes. Discuss the available material colours and lane layout with the sample and drawing.

Is a fixed installation time included?

The programme depends on the venue, base preparation, weather and specified construction.

What documents should a school request?

The proposed system data, applicable material tests, handling instructions and any project-specific athletics documentation.

What is needed for a proposal?

Country, track plan, base photographs, use requirements and the required testing and delivery arrangements.

Discuss Your School Athletics Track
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.