logo
Products
PRODUCTS DETAILS
Home > Products >
Professional Hybrid Plastic Running Track 13mm Thick PU And EPDM Materials Short Lead Time For Competitions And Training

Professional Hybrid Plastic Running Track 13mm Thick PU And EPDM Materials Short Lead Time For Competitions And Training

MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,L/C,Paypal
Supply Capacity: 40000 sq.m per Month
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
Hybrid
Weather Resistance:
Excellent
Shock Absorption:
Excellent
Slip Resistance:
Excellent
UV Resistance:
Excellent
Durability:
Excellent
Surface Color:
Customized
Color:
Many Colors Can Be Chosen, Welcome To Customize
Thickness:
10mm,15mm,20mm Or Customized
Highlight:

13mm Thick PU Plastic Running Track

,

Hybrid Running Track For Training

,

EPDM Materials Hybrid Running Track

Product Description
13mm hybrid track · Competition and training projects

A running-track system
for practice and event days.

Plan a dedicated athletics surface using the 13mm PU-and-EPDM hybrid option.

Marked red stadium running track from the original supplier project material

Athletics venues need clearly defined running lanes and a construction chosen for their planned activities. This hybrid track combines a granular wearing finish with an elastic layered structure.

Include the training programme, competition requirements and target opening date in the material proposal.

Get a Training-Track Proposal
PU and EPDM materials

Specify the whole 13mm system,
from elastic layers to finish.

The original hybrid graphic shows rubber granules and PU reinforcement within a layered surface. The visible texture and supporting construction serve different roles within the track.

The nominal 13mm option is selected with a defined layer schedule and application quantities. Keep these details with the quotation and the installer instructions.

Original hybrid PU and granule construction reference
Supply timing

Keep material delivery
aligned with opening day.

For a time-sensitive venue, share the required arrival date and destination at the start of the enquiry. Confirm the construction, colours and quantities together so the supply request is clear.

Ask for the current preparation and dispatch schedule for that order. Transport, site work, curing and acceptance each need their own place in the programme.

The agreed quotation records the supply timing for the selected materials.

Track-material drums loaded for dispatch
Training layout

Make the lane plan
fit the activities.

Plan straight running, bends and access around the venue drawing. Markings and any additional athletics areas are coordinated before installation.

For competitions, identify the applicable event and facility requirements early. Confirm the necessary system documents and venue checks with the project team.

Finished running lanes beside a sports field in the original Shenzhen Fumin project reference
Construction programme

From prepared base
to finished athletics space.

Base readiness affects the surfacing programme. Confirm repairs, levels and water routes before the materials reach site.

The Tianshui reference shows the running surface during the finishing stage. Line marking, curing and acceptance remain separate steps in completing a usable track.

Tianshui sports-centre hybrid running track during finishing before lane marking
Order specification

Put the project choices
in one material schedule.

Brand / model USAWEGI / Hybrid
Selected nominal thickness 13mm with the project build-up confirmed
Material category PU and EPDM-granule hybrid running surface
Venue brief Training and planned athletics-event requirements
Finish Chosen colour and granular surface texture
Delivery Order preparation, dispatch and transport arrangements agreed in the quotation
Acceptance Required system documents and site checks stated for the project
Installation

Apply the construction.
Complete the functional markings.

Follow the specified preparation, material placement and curing sequence. Check each stage against the agreed construction before moving forward.

The final lane layout follows the approved drawing. Installation guidance and the division of local work can be discussed with the supply package.

Elastic layer application, running-surface finishing and lane-marking stages
Material and performance documents

Choose evidence
that matches the offered track.

Request the technical data, handling guidance and relevant test records for the proposed materials. Any athletics approval must apply to the identified system and required use.

Agree the project testing and handover requirements with the venue team. A product image cannot establish the performance of an installed facility.

Supplier coordination

Keep supply and site work
working from the same plan.

USAWEGI can discuss running-track material supply, project drawings and installation guidance. Confirm components, quantities, packaging and receiving checks before dispatch.

Use one drawing and material list when communicating with the supplier, installer and venue operator.

Supplier project and customer communication photographs
Care and common questions

Prepare for the next
training session and event.

Clear debris, maintain water outlets and inspect the lanes and edges. Follow the specified cleaning and care instructions for the supplied finish.

How is the short-lead-time enquiry handled?

Send the required arrival date, destination and material quantity. The current order preparation and dispatch schedule is confirmed in the quotation.

Does delivery mean the venue can open immediately?

The site programme also includes preparation, installation, curing, markings and acceptance.

What if the venue hosts competitions?

State the relevant athletics requirements and request the applicable system documents and venue tests.

What should I send first?

Country, track drawing, construction stage, required thickness, activities and target dates.

Discuss Your Track and Delivery Plan
Products
PRODUCTS DETAILS
Professional Hybrid Plastic Running Track 13mm Thick PU And EPDM Materials Short Lead Time For Competitions And Training
MOQ: 1000 square meters
Price: Negotiable
Standard Packaging: barrrel
Delivery Period: within 15 days after balance
Payment Method: T/T,L/C,Paypal
Supply Capacity: 40000 sq.m per Month
Detail Information
Place of Origin
the United States
Brand Name
USAWEGI
Certification
WA/Labosports/IAAF/ISO9001
Model Number
Hybrid
Weather Resistance:
Excellent
Shock Absorption:
Excellent
Slip Resistance:
Excellent
UV Resistance:
Excellent
Durability:
Excellent
Surface Color:
Customized
Color:
Many Colors Can Be Chosen, Welcome To Customize
Thickness:
10mm,15mm,20mm Or Customized
Minimum Order Quantity:
1000 square meters
Price:
Negotiable
Packaging Details:
barrrel
Delivery Time:
within 15 days after balance
Payment Terms:
T/T,L/C,Paypal
Supply Ability:
40000 sq.m per Month
Highlight

13mm Thick PU Plastic Running Track

,

Hybrid Running Track For Training

,

EPDM Materials Hybrid Running Track

Product Description
13mm hybrid track · Competition and training projects

A running-track system
for practice and event days.

Plan a dedicated athletics surface using the 13mm PU-and-EPDM hybrid option.

Marked red stadium running track from the original supplier project material

Athletics venues need clearly defined running lanes and a construction chosen for their planned activities. This hybrid track combines a granular wearing finish with an elastic layered structure.

Include the training programme, competition requirements and target opening date in the material proposal.

Get a Training-Track Proposal
PU and EPDM materials

Specify the whole 13mm system,
from elastic layers to finish.

The original hybrid graphic shows rubber granules and PU reinforcement within a layered surface. The visible texture and supporting construction serve different roles within the track.

The nominal 13mm option is selected with a defined layer schedule and application quantities. Keep these details with the quotation and the installer instructions.

Original hybrid PU and granule construction reference
Supply timing

Keep material delivery
aligned with opening day.

For a time-sensitive venue, share the required arrival date and destination at the start of the enquiry. Confirm the construction, colours and quantities together so the supply request is clear.

Ask for the current preparation and dispatch schedule for that order. Transport, site work, curing and acceptance each need their own place in the programme.

The agreed quotation records the supply timing for the selected materials.

Track-material drums loaded for dispatch
Training layout

Make the lane plan
fit the activities.

Plan straight running, bends and access around the venue drawing. Markings and any additional athletics areas are coordinated before installation.

For competitions, identify the applicable event and facility requirements early. Confirm the necessary system documents and venue checks with the project team.

Finished running lanes beside a sports field in the original Shenzhen Fumin project reference
Construction programme

From prepared base
to finished athletics space.

Base readiness affects the surfacing programme. Confirm repairs, levels and water routes before the materials reach site.

The Tianshui reference shows the running surface during the finishing stage. Line marking, curing and acceptance remain separate steps in completing a usable track.

Tianshui sports-centre hybrid running track during finishing before lane marking
Order specification

Put the project choices
in one material schedule.

Brand / model USAWEGI / Hybrid
Selected nominal thickness 13mm with the project build-up confirmed
Material category PU and EPDM-granule hybrid running surface
Venue brief Training and planned athletics-event requirements
Finish Chosen colour and granular surface texture
Delivery Order preparation, dispatch and transport arrangements agreed in the quotation
Acceptance Required system documents and site checks stated for the project
Installation

Apply the construction.
Complete the functional markings.

Follow the specified preparation, material placement and curing sequence. Check each stage against the agreed construction before moving forward.

The final lane layout follows the approved drawing. Installation guidance and the division of local work can be discussed with the supply package.

Elastic layer application, running-surface finishing and lane-marking stages
Material and performance documents

Choose evidence
that matches the offered track.

Request the technical data, handling guidance and relevant test records for the proposed materials. Any athletics approval must apply to the identified system and required use.

Agree the project testing and handover requirements with the venue team. A product image cannot establish the performance of an installed facility.

Supplier coordination

Keep supply and site work
working from the same plan.

USAWEGI can discuss running-track material supply, project drawings and installation guidance. Confirm components, quantities, packaging and receiving checks before dispatch.

Use one drawing and material list when communicating with the supplier, installer and venue operator.

Supplier project and customer communication photographs
Care and common questions

Prepare for the next
training session and event.

Clear debris, maintain water outlets and inspect the lanes and edges. Follow the specified cleaning and care instructions for the supplied finish.

How is the short-lead-time enquiry handled?

Send the required arrival date, destination and material quantity. The current order preparation and dispatch schedule is confirmed in the quotation.

Does delivery mean the venue can open immediately?

The site programme also includes preparation, installation, curing, markings and acceptance.

What if the venue hosts competitions?

State the relevant athletics requirements and request the applicable system documents and venue tests.

What should I send first?

Country, track drawing, construction stage, required thickness, activities and target dates.

Discuss Your Track and Delivery Plan
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.