| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | T/T,L/C,Paypal |
| Supply Capacity: | 40000 sq.m per Month |
Bring the selected PU glue and EPDM granules into the hybrid-track component schedule. The quotation ties the materials to the layer construction and the measured project area.
For a contractor buying in quantity, this helps compare the actual component package instead of unrelated drum and bag prices.

The selected binder connects the compatible rubber materials within the construction, while the chosen granules contribute to the specified rubber surface. Component grades and quantities follow the offered system.
Keep mixing and application instructions with that material selection. A different layer design can require a different component schedule even where the visible colour is similar.

The track layout identifies areas, colours and connected activity zones. The selected sample and construction give the quantity calculation a defined reference.
Discuss the required component types and packing units with the order. The proposal identifies which materials and quantities belong to each project stage.

Confirm the chosen formulation, order quantity, production or stock availability and destination when agreeing dispatch. Shipping timing belongs to the actual material order.
This allows the supply plan to address the contractor’s site programme without assuming every colour and quantity is ready for immediate shipment.

USAWEGI can discuss component selection, quantities, packing and installation guidance. The receiving list keeps material identification and the project reference together.
Check labels, quantities and visible condition before application. Store and handle each supplied material according to its instructions and retain the records for site use.
The supplied construction guides maintenance and compatible local repairs. Clear debris and water outlets and inspect busy sections of the completed track.
Send the country, drawing, selected layer design, colours and requested delivery window. We can prepare an itemised PU-and-EPDM material proposal for the project.
Get Your Project Supply Proposal
| MOQ: | 1000 square meters |
| Price: | Negotiable |
| Standard Packaging: | Drums |
| Delivery Period: | 15-30 days, depending on order requirements |
| Payment Method: | T/T,L/C,Paypal |
| Supply Capacity: | 40000 sq.m per Month |
Bring the selected PU glue and EPDM granules into the hybrid-track component schedule. The quotation ties the materials to the layer construction and the measured project area.
For a contractor buying in quantity, this helps compare the actual component package instead of unrelated drum and bag prices.

The selected binder connects the compatible rubber materials within the construction, while the chosen granules contribute to the specified rubber surface. Component grades and quantities follow the offered system.
Keep mixing and application instructions with that material selection. A different layer design can require a different component schedule even where the visible colour is similar.

The track layout identifies areas, colours and connected activity zones. The selected sample and construction give the quantity calculation a defined reference.
Discuss the required component types and packing units with the order. The proposal identifies which materials and quantities belong to each project stage.

Confirm the chosen formulation, order quantity, production or stock availability and destination when agreeing dispatch. Shipping timing belongs to the actual material order.
This allows the supply plan to address the contractor’s site programme without assuming every colour and quantity is ready for immediate shipment.

USAWEGI can discuss component selection, quantities, packing and installation guidance. The receiving list keeps material identification and the project reference together.
Check labels, quantities and visible condition before application. Store and handle each supplied material according to its instructions and retain the records for site use.
The supplied construction guides maintenance and compatible local repairs. Clear debris and water outlets and inspect busy sections of the completed track.
Send the country, drawing, selected layer design, colours and requested delivery window. We can prepare an itemised PU-and-EPDM material proposal for the project.
Get Your Project Supply Proposal