logo
Products
PRODUCTS DETAILS
Home > Products >
Full PU School Running Track Surface for Daily Training and Sports Day Use

Full PU School Running Track Surface for Daily Training and Sports Day Use

MOQ: 1000 square meters
Price: Price Upon Request
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
LABOSPORS/WA/ISO 9001/CE/SGS/
Model Number
USWG-FPU-3
Material:
PU Binder And EPDM Rubber Granules
Surface Type:
Seamless Non Porous Full PU System
Available Thickness:
13 Mm To 25 Mm
Force Reduction:
43 Percent
Tensile Strength:
0.8 MPa
Elongation At Break:
90 Percent
Wet Skid Resistance:
56 BPN
Project Positioning:
Professional Full PU Track System
Recommended Application:
University School And Training Center
Color Options:
Red Blue Green And Custom Colors
Customization:
Color Thickness Logo And Line Marking
Weather Resistance:
UV And Weather Resistant
Project Service:
Material Planning And Technical Guidance
OEM ODM:
Available
Sample Lead Time:
1-3 Days
Highlight:

Full PU school running track

,

Polyurethane running track surface

,

Daily training running track

Product Description

Bring PE lessons, practice and sports-day use into one brief

USWG-FPU-3 gives the school a full-PU surface direction for its running area. Choose the construction with the weekly programme and the people caring for the facility.

A shared layout can connect daily training with the markings and activity areas needed for sports day, keeping the material proposal tied to the school plan.

School athletics field surrounded by blue running lanes

Choose the full-PU build and thickness together

The listed construction uses PU binder and EPDM materials as a seamless, non-porous system. Select the actual layers within the stated 13–25 mm direction.

The approved sample links the finish and material combination. Relevant surface-performance information must identify the construction offered for the school.

Full-PU surface layer illustration
Illustrative

Colours and markings that fit the school activities

Red, blue, green and custom colour directions are listed. Arrange running lanes, activity zones and any selected logos on the measured layout.

Approve samples and line references with the final construction. The visual plan is kept with material quantities and the application sequence.

School running track and sports-field markings

Prepare drainage and the base before the school finish

The non-porous surface relies on the designed levels and outlets. Complete the foundation work before applying the compatible PU layers.

Follow application and curing instructions, finish markings and complete the agreed checks. Coordinate opening with the actual readiness of the installed surface.

Full-PU installation and marking illustration
Illustrative

A practical handover for the grounds team

Keep debris and water outlets clear and inspect entrances and busy lane edges. Cleaning and local repairs follow the chosen construction.

USAWEGI can discuss samples, material planning, quantities and installation guidance. The order identifies supplies and requested services for the school.

Keep the programme connected to the material records

Retain the approved colour sample, component identity and care instructions. Written warranty terms define any coverage for the actual order.

Send the country, school layout, activities and preferred finish. We can prepare an FPU-3 school-track proposal.

Get Your Project Surface Proposal
Products
PRODUCTS DETAILS
Full PU School Running Track Surface for Daily Training and Sports Day Use
MOQ: 1000 square meters
Price: Price Upon Request
Standard Packaging: Drums
Delivery Period: 15-30 days, depending on order requirements
Payment Method: L/C,T/T
Supply Capacity: 10000 Square Meter Per Week
Detail Information
Place of Origin
Guangdong,China
Brand Name
USAWEGI
Certification
LABOSPORS/WA/ISO 9001/CE/SGS/
Model Number
USWG-FPU-3
Material:
PU Binder And EPDM Rubber Granules
Surface Type:
Seamless Non Porous Full PU System
Available Thickness:
13 Mm To 25 Mm
Force Reduction:
43 Percent
Tensile Strength:
0.8 MPa
Elongation At Break:
90 Percent
Wet Skid Resistance:
56 BPN
Project Positioning:
Professional Full PU Track System
Recommended Application:
University School And Training Center
Color Options:
Red Blue Green And Custom Colors
Customization:
Color Thickness Logo And Line Marking
Weather Resistance:
UV And Weather Resistant
Project Service:
Material Planning And Technical Guidance
OEM ODM:
Available
Sample Lead Time:
1-3 Days
Minimum Order Quantity:
1000 square meters
Price:
Price Upon Request
Packaging Details:
Drums
Delivery Time:
15-30 days, depending on order requirements
Payment Terms:
L/C,T/T
Supply Ability:
10000 Square Meter Per Week
Highlight

Full PU school running track

,

Polyurethane running track surface

,

Daily training running track

Product Description

Bring PE lessons, practice and sports-day use into one brief

USWG-FPU-3 gives the school a full-PU surface direction for its running area. Choose the construction with the weekly programme and the people caring for the facility.

A shared layout can connect daily training with the markings and activity areas needed for sports day, keeping the material proposal tied to the school plan.

School athletics field surrounded by blue running lanes

Choose the full-PU build and thickness together

The listed construction uses PU binder and EPDM materials as a seamless, non-porous system. Select the actual layers within the stated 13–25 mm direction.

The approved sample links the finish and material combination. Relevant surface-performance information must identify the construction offered for the school.

Full-PU surface layer illustration
Illustrative

Colours and markings that fit the school activities

Red, blue, green and custom colour directions are listed. Arrange running lanes, activity zones and any selected logos on the measured layout.

Approve samples and line references with the final construction. The visual plan is kept with material quantities and the application sequence.

School running track and sports-field markings

Prepare drainage and the base before the school finish

The non-porous surface relies on the designed levels and outlets. Complete the foundation work before applying the compatible PU layers.

Follow application and curing instructions, finish markings and complete the agreed checks. Coordinate opening with the actual readiness of the installed surface.

Full-PU installation and marking illustration
Illustrative

A practical handover for the grounds team

Keep debris and water outlets clear and inspect entrances and busy lane edges. Cleaning and local repairs follow the chosen construction.

USAWEGI can discuss samples, material planning, quantities and installation guidance. The order identifies supplies and requested services for the school.

Keep the programme connected to the material records

Retain the approved colour sample, component identity and care instructions. Written warranty terms define any coverage for the actual order.

Send the country, school layout, activities and preferred finish. We can prepare an FPU-3 school-track proposal.

Get Your Project Surface Proposal
USA WEGI SPORTS INDUSTRY INC U.S.-based sales and project support backed by Guangdong Asher’s established sports flooring manufacturing and supply chain in China.