| MOQ: | 500 square meters |
| Price: | Price Upon Request |
| Standard Packaging: | Steel Drums, Woven Bags and Pallet Packaging |
| Delivery Period: | 15-30 days depending on configuration and quantity |
| Payment Method: | T/T 30% deposit and 70% balance before delivery,L/C |
| Supply Capacity: | 10,000 Square Meters / Week |
In Southeast Asia, coastal South America, and high-humidity regions, concrete slabs often trap residual vapor. When generic elastic coatings are applied without a matched moisture-blocking primer or are troweled too thick in a single pass, trapped vapor expands under sunlight and causes blistering.
USAWEGI supplies the complete matched Silicon PU system—primer, elastic cushion coats, water-based wear topcoat, and line paint—so contractors do not mix incompatible third-party chemicals on site.
| 1. Waterproof Primer Layer | Penetrates concrete pores, seals residual vapor, and anchors the elastic layer to concrete or asphalt slabs. |
|---|---|
| 2. Silicon PU Elastic Layer | Applied in multiple thin coats (never one heavy pass) to achieve uniform shock absorption and rebound without trapping gas. |
| 3. Reinforced Transition Coat | Bridges the elastic core and topcoat for dimensional stability under heavy footwork and sudden stops. |
| 4. UV-Stable Wear Topcoat | Anti-slip, weather-resistant colored surface layer formulated for outdoor sun and rain exposure. |
| 5. High-Contrast Line Paint | Crisp, wear-resistant court markings for basketball, badminton, or multi-sport layouts. |
| Design Service Life | 10 years under standard sub-base and maintenance conditions (not an unconditional warranty). |
We calculate exact drum quantities for primer, elastic layer, transition coat, wear topcoat, and line paint based on your court square meters and target thickness (3mm / 4mm / 5mm), preventing mid-project material shortages.
Consistent batch-to-batch viscosity and color stability, sealed steel drums on export pallets, and OEM drum labeling support so your local builders get reliable curing results across seasons.
Silicon PU components are packed in heavy-duty sealed steel drums, woven bags, and strapped export pallets to prevent moisture ingress during ocean freight. Before opening stored drums across seasons, inspect viscosity and stir thoroughly per our mixing guide.
| MOQ: | 500 square meters |
| Price: | Price Upon Request |
| Standard Packaging: | Steel Drums, Woven Bags and Pallet Packaging |
| Delivery Period: | 15-30 days depending on configuration and quantity |
| Payment Method: | T/T 30% deposit and 70% balance before delivery,L/C |
| Supply Capacity: | 10,000 Square Meters / Week |
In Southeast Asia, coastal South America, and high-humidity regions, concrete slabs often trap residual vapor. When generic elastic coatings are applied without a matched moisture-blocking primer or are troweled too thick in a single pass, trapped vapor expands under sunlight and causes blistering.
USAWEGI supplies the complete matched Silicon PU system—primer, elastic cushion coats, water-based wear topcoat, and line paint—so contractors do not mix incompatible third-party chemicals on site.
| 1. Waterproof Primer Layer | Penetrates concrete pores, seals residual vapor, and anchors the elastic layer to concrete or asphalt slabs. |
|---|---|
| 2. Silicon PU Elastic Layer | Applied in multiple thin coats (never one heavy pass) to achieve uniform shock absorption and rebound without trapping gas. |
| 3. Reinforced Transition Coat | Bridges the elastic core and topcoat for dimensional stability under heavy footwork and sudden stops. |
| 4. UV-Stable Wear Topcoat | Anti-slip, weather-resistant colored surface layer formulated for outdoor sun and rain exposure. |
| 5. High-Contrast Line Paint | Crisp, wear-resistant court markings for basketball, badminton, or multi-sport layouts. |
| Design Service Life | 10 years under standard sub-base and maintenance conditions (not an unconditional warranty). |
We calculate exact drum quantities for primer, elastic layer, transition coat, wear topcoat, and line paint based on your court square meters and target thickness (3mm / 4mm / 5mm), preventing mid-project material shortages.
Consistent batch-to-batch viscosity and color stability, sealed steel drums on export pallets, and OEM drum labeling support so your local builders get reliable curing results across seasons.
Silicon PU components are packed in heavy-duty sealed steel drums, woven bags, and strapped export pallets to prevent moisture ingress during ocean freight. Before opening stored drums across seasons, inspect viscosity and stir thoroughly per our mixing guide.